Forum quick links
Any success with this credit yet?
Pilot-Credits INpc113:Informing Design Using Triple Bottom Line Analysisposted by Sophie Kerr on
Hello,
I've submitted for this pilot credit but haven't received reviewer comments yet, has anyone received comments, what are they?
Sophie
IPpc90 Social Equity within the Project Team - Option 1
Pilot-Credits IPpc90:Social equity within the operations and maintenance staffposted by Atlas Turner on
Greetings All,
MERV 14 and WELL
Pilot-Credits INpc155:Design for Indoor Air Quality and Infection Controlposted by Chris Osterhoudt on
For projects pursuing WELL certification in tandem with LEED, MERV filtration requirements are already being met, and ventilation strategies are outlines in the Sequence of Operations as part of th
Is LEED v4.1 Acoustic Performance 1 point or 2?
NC-v4.1 EQc9:Acoustic Performanceposted by Douglas Flandro on
The LEED v4.1 reference guide and the USGBC website say that the credit is one point. LEED Online also seems to indicate that it is one point.
EPD, option 2 - how to know if the EPD contributes?
NC-v4.1 MRc2:Environmental Product Declarationsposted by Amanda Cunningham on
I have read through a lot of threads in this forum and am still not understanding how I can look at an EPD and confirm if it contributes to option 2.
Calculating Quality Views Credit
NC-v4 EQc8:Quality viewsposted by Divya Shroff on
Have projects used softwares to document the quality views credit? I am looking into a 300k sqft school project and wanted to know whats the best way to document this credit.
EV Vehicle Signage and ability to combine with Handicap Parking
NC-v4.1 LTc8:Electric Vehiclesposted by Summer Gorder on
We have a County project that would like to combine EV with Handicap parking. Can that contribute toward the 5%?
ASHRAE 90.1 Section 6.5.3
NC-v4 EAp2:Minimum energy performanceposted by Michael Abramson on
Good afternoon all,
Easily Achievable Where Mandates are in Place
Pilot-Credits SSpc129:Comprehensive Compostingposted by Marsha Gentile on
This pilot credit is easily achievable where mandates and infrastructure (by municipality and/or base building in case of CI project) are in place.
IPpc98 feasibility for USACE projects
Pilot-Credits IPpc98:Assessment and Planning for Resilienceposted by Alison Kerr on
The credit can be documented and achieved for USACE projects, and it is in line with Army customer increased attention to resilience.