NC V4: Advanced Energy Metering of Entire Building
NC-v4 EAc3:Advanced energy meteringposted by Erik Gutierrez on
Hello all, I'm looking at metering a new construction building with a single controller.
EAp1-1 Commissioning Report Upload Location Missing
CI-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Sam Stoltze on
The new LEED Online interface seems to be missing the ability to upload a commissioning report.
Submitting New Design Credits During Construction Review
posted by Charlie Haas on
I am working on a project that underwent a split review. We have received and accepted our final design review submission.
"Mixed C&D"
NC-2009 MRc2:Construction Waste Managementposted by Esmeralda Ward on
On a current project under construction the contractor's waste hauler has been submitting monthly reports that have a list of materials on it, including Wood, Concrete, etc.
Medical Center MRI, CT Scan Rooms
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Sara Zoumbaris on
Although the October 2013 Matrix, does not allow any patient rooms to be without daylighting/ views, I believe these rooms could be eliminated due to the nature of their process.
Mid Review Clarification of LEED Project Boundary
posted by Nicholas Klever on
We have submitted an addition project for Design and Construction review under the new construction and renovation system.
Signatory requirements ( Does engineer need to be PE ? )
NC-2009 EAp2:Minimum Energy Performanceposted by Matt Dem on
Shall the person who enters his/her initials under signatory section ( for example EAp2-1, 2-2, 2-3 ) be registered mechanical engineer (PE) ?
Does energy model should include walls to be consistent w/ Plf2
NC-2009 EAp2:Minimum Energy Performanceposted by Matt Dem on
I am working on a project (2 story office building) as a LEED AP & architect and received Preliminary Design Package comments from GBCI.
"Single Site" requirement for a Master Site?
posted by Richard Barlow on
We are working on a 30+ acre medical campus for a single developer. There will be a total of 9 buildings in this development, and all buildings will pursue LEED certification.
New Construction vs Major Renovation
NC-2009 EAp2:Minimum Energy Performanceposted by Ritwik Kakati on
Our project consists of renovation of 140,000 SF of an existing building, as well as the addition of 30,000 SF of new space.