Forum quick links
Open-plan office classification under Thermal Comfort controls
NC-v4 EQc5:Thermal comfortposted by Norbert Harmathy on
Hello,
We are applying for the v4 New Construction Thermal Comfort credit and will have manual controls (overriding automatic) of air temperatures within offices and shared spaces.
Acceptable Forms of a Tenant Lease Agreement | LEED Design Review Comments
CS-v4 EAp2:Minimum energy performanceposted by Eric Schlichting on
Hi,
CO2 monitoring for Core and Shell projects
CS-v4 EQc1:Enhanced indoor air quality strategiesposted by Irene Chung on
Hi, Is a copy of the lease agreement stating that tenants must install co2 sensors in all densely occupied spaces required for v4 Core and Shell projects?
Water Fountains
CI-v4 WEp1:Indoor water use reductionposted by on
Do commercial water fountains, for offices, need to be WaterSense or a part of the water calculations?
Reduce Parking Footprint
NC-v4 LTc7:Reduced parking footprintposted by Hadar Farjo on
LT Credit : Reduced parking Foot print Can this credit be achieved if there are no parking spaces provided and we are using existing parking lot for the new building?
Garage Lighting following Strategies A and D
NC-v4 EQc6:Interior lightingposted by Edgar Arevalo on
So i know I left two questions in the past about this topic, and got no response. So hoping third time is the charm since we got comments back from the design credit review.
Sample Documentation
NC-v4 EAc3:Advanced energy meteringposted by JAMES ELWIN FERNANDEZ on
Do you have sample documentation for this credit?
Corporate Campus with Dining Hall
Pilot-Credits SSpc129:Comprehensive Compostingposted by Rebecca Pearce on
We worked on this credit for a 15 story corporate campus collaboratively between the architects, compost hauler, and catering company who is responsible for a first floor dining hall.
LEED Core and Shell Existing Parking Garage Lighting and Ventilation System
CS-v4 EAp2:Minimum energy performanceposted by Michael Hill on
I am working on a project that has 3 levels of parking in addition to 10 floors of office space/labs. On the parking levels, no changes have been made to the lighting or ventilation systems.
Contaminated material in a bulldozer demolition
NC-v4 MRp2:Construction and demolition waste management planningposted by Priscillia Champagne on
Hi LeedUser,