Purchasing Policy Prerequisite

EBOM-v4.1 MRp1:Purchasing Policy
posted by  Sean Smith  on 

I'm working on a project where the property manager told us the only on-going purchases for the buliding are cleaning supplies (brooms, garbage bags, gloves) and all other purchases are t

0
4
Wed Jan 24, 2024, 10:21 pm

LEED O+M v4 Warehouses and Distribution Centers

LEED Rating System Selection
posted by  Ralph Bicknese  on 

We are evaluating utilizing LEED O+M for Warehouses and Distribution Centers for a 1.5M sf Distribution Center where the all parties are very interested in being able to achieve a LEED rating and r

1
Thu May 9, 2024, 10:10 pm

Hiring - LEED Project Administrator

Help Wanted: LEED-related Jobs
posted by  Trisha Highnote  on 

Rennell Associates, LLC, is seeking a candidate to join our team as LEED® PROJECT ADMINISTRATOR.

0

Mastic

NC-v4.1 EQc4:Indoor Air Quality Assessment
posted by  Michelle Lockert  on 

Can anyone tell me if it is okay to utilize mastic “outside” the building envelope?

Thank you.

2
Sun Jan 14, 2024, 4:04 am

Pilot-Credits EQpc57: Enhanced acoustical performance - exterior noise control

Pilot-Credits EQpc57:Enhanced acoustical performance - exterior noise control
posted by  Olawale Taiwo  on 

Hello Sound & Acoustic Specialist (LEED APs),

Please I need a quick confirmation on this Pilot credit EQpc57.

1
Mon May 20, 2024, 2:28 pm

View Type 1 with non-continuous window glazing

NC-v4 EQc8:Quality views
posted by  Edgar Arevalo  on 

I have a library that has a reading area with windows surrounding all sides but are separate by the interior wall, which makes the glazing non-continuous.  The wall space between windows are a

8
Director of Sustainability
Fentress Architects
LEEDuser Expert
224 thumbs up
Thu Jan 11, 2024, 6:46 pm

"Weighted sum of non-roof and roof measures" Issue

NC-v4 SSc5:Heat island reduction
posted by  Edgar Arevalo  on 

Under the Summary of Heat Island Reduction Measures, the footnote says "Weighted sum of nonroof and roof measures must be greater than or equal to sum of project paving and roof area for 2 points."

2
Managing Partner
Ecoimpact Consulting
LEEDuser Expert
171 thumbs up
Thu Jan 11, 2024, 5:43 pm

Desiccant Wheel Modeling for Baseline case

NC-v4.1 EAp2:Minimum Energy Performance
posted by  John   on 

I am working on a model which has Desiccant wheel in design case. Do we need to model desiccant wheel in baseline case as well?

2
Principal
ME Engineers
LEEDuser Basic Member
30 thumbs up
Wed Jan 10, 2024, 11:12 am

CDWM - Recycling Facility Diversion Rate

NC-v4 MRp2:Construction and demolition waste management planning
posted by  Preethi Sreeraj  on 

It is clear from the guidance that a project will need the diversion rate of the Comingled facility that is regulated by local or state agency, but is this applicable for source separated wast

0