Items that are used for either MRc4 or MRc3
NC-2009 MRc4:Recycled Contentposted by Erika Duran on
Dear All, I am unclear about something. If I have items that would qualify for MRc3 but we are not pursuing that credit, is it acceptable to count them towards MRc4?
Re-commisioning
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by John Wood on
I am a PE who has been approached by a building owner with a request to have the building "re-commissioned." I have designed LEED projects before, and participated in the original commissioning, b
NC-v4 LTc2: Sensitive land protection/Wetland Protection
NC-v4 LTc2:Sensitive land protectionposted by Robyn Dowsey on
Is there a precedent anywhere for getting this credit with wetland mitigation plan where small inactive wetlands were included in the project footprint but an equal or greater wetland area was purc
Option 2
NC-v4 SSc4:Rainwater managementposted by henry nguyen on
Hello, I wonder how should I understand Opt.2 BD+C Rain water Mgmt credit. "Manage on site the annual increase in runoff volume from the natural land cover condition to the post-developed conditio
Asbestos Remediation
NC-2009 SSc3:Brownfield Redevelopmentposted by Jeannie Rueter on
The first phase of our Job Corps project was to construct a new cafeteria on campus. The second phase is to demolish the old cafeteria. The old cafeteria has asbestos in it.
Water reclaimed wood?
NC-2009 MRc3:Materials Reuseposted by Ilana Judah on
We are looking at a product that is wood reclaimed from dead underwater trees due to flooding in a region.
Participant Survey
Pilot-Credits PC14:Walkable Streetsposted by Bryan Finnegan on
The link provided to us for the Pilot Credit Participant Survey only directs to the USGBC homepage. Is there an up to date link for this?
Process verses intent
posted by Martha Norbeck on
The LEED reviewers, once again, have succeeded in exasperating me and my team. We submitted under alternative compliance making a case that our approach supports the intent of the credit and why.
Chilled Water Use for part of a floor
CI-v4 EAc3:Advanced energy meteringposted by Annie Argento on
How would a tenant who leases part of a floor in a high rise building meter their use of chilled water from the base building plant?
Interview Room with 2 seats
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Maher Hemod on
what dose consider an interview room with 2 seats in a hospital project, is it individual occupant space or shared multi occupant ? Thanks in advance.