Forum quick links
Exemption for workshop spaces?
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Adrienne Franz on
We are doing a building where half the building is offices and the other half is workshops for parks maintenence staff. (I'm talking mechanical, carpentry, tree crew).
How set up dummy project without paying the registration fee?
posted by Edward Sager on
Is there a way to set up a dummy project for educational purposes (to learn more about the LEED process) without paying a registration fee?
If yes, could you please let me know how?
Option 1: Disadvantaged Community
NC-v4.1 LTc3:High Priority Site and Equitable Developmentposted by Neil Rosen on
There is a significant discrepancy between the information provided on census tract versus that of state government. There is a NYS Disadvantaged Communities website that clearly indicates th
Strategy 7. Operable Windows - ASHRAE 62.1-2016 for windows location
NC-v4.1 EQc1:Enhanced Indoor Air Quality Strategiesposted by MAUDE PINTAL on
Hello
Baseline HVAC, Non-regulated loads and Exceptional Calculation Method for V4.1
NC-v4.1 EAp2:Minimum Energy Performanceposted by on
A 156,000 SF pharmaceutical production facility wants to pursue LEED v4.1. Building breakdown as follows:
Healthcare-v4.1 MRc6: PBT Source Reduction - Lead, Cadmium, and Copper
Healthcare-v4.1 INc1:Innovationposted by Ann Busker on
Good morning,
LEED certification for open spaces
posted by Sergio Acevedo on
We would like our expansion project to be LEED certified.
There will be no physical separation between the existing building and the extension (no walls).
How can a warehouse extension project (with no regularly occupied space) comply with EQp1?
Warehouses-NC-v4 EQp1:Minimum indoor air quality performanceposted by Blake Jackson on
I'm working on a 455,000gsf expansion of an existing facility, which will have all new/standalone systems to support the new wing.
MRpc87 Verified Construction and Demo Recycling Rates
NC-v4 INc1:Innovationposted by Marie Bizzak on
We are submitting for Pilot Credit 87 - Verified Construction & Demolition Recycling Rates. We have completed a. What is required for documentation and upload for b.
LEED-focused part-time job
posted by Dan Piselli on
FXCollaborative is looking for part-time help completing in-house LEED documentation on a few projects.