Location: Malaysia

Project type: Warehouse

The project is located in a site that is previously developed where a portion of the land is already constructed (Manufacturing Unit) and another portion of the land which is the warehouse of the manufacturing unit is going for certification now, and both are owned by the same owner. 

In this case can we consider the project site as previously developed land?