Forum quick links
Horizzontally attached bldg addition to Non Certified building
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Tesfa Bogale on
We are working on a new building addition. The new addition building will be attached horizontally to a non LEED-Certified building.
Energy Modeling Licensure
NC-2009 EAp2:Minimum energy performanceposted by Nathan Echtenkamp on
Does anyone know if any states require a P.E. license to offer energy modeling as a professional service? In other words, can a non-licensed individual start an energy modeling firm?
Energy Star Equipment / Appliances
CI-2009 EAp2:Minimum energy performanceposted by Catherine Blakemore on
Does this include things like 2/4 slice bread toasters and drip coffee makers?
GC Responsible for Implementing Option B?
NC-2009 EAc5:Measurement and verificationposted by Marcia Weekes on
Does anyone have any experience with projects where a GC has been given the responsibility for implementing the M&V credit using Option B?
Anti-Rust vs flat primer
NC-2009 IEQc4.2:Low-emitting materials - paints and coatingsposted by Michelle Raigosa on
Does anyone have any insight/thoughts/comments/experience about categorizing an anti-rust coating as compared to categorizing the product as a flat coating/primer?
ASHREA 0-2005
NC-v4 EAc1:Enhanced commissioningposted by Amrit Kaur on
Any one knows where I can get the referenced 0-2005 standard? officially its no longer available from ASHREA and superseded by 0-2013. Any idea how different they may be?
Energy Star eligibility for very large Display Monitors
CI-2009 EAc1.4:Optimize energy performance - equipment and appliancesposted by Harry Flamm on
Nowhere on the Energy Star site can I find out if 75" wide and larger Professional Display Monitors (such as Samsung or NEC for conference rooms) are eligible or not for an Energy Star rating. I h
Occupants / users of public park
NC-2009 WEp1:Water use reductionposted by Deborah Lucking on
Our project includes the creation of a park, and construction of a pavilion with restrooms for park users. The challenge - how do we calculate the number of FTEs using these restrooms?
Functional, usable spaces
NC-2009 SSc7.2:Heat island effect - roofposted by Jeannie Rueter on
What is the definition of "functional, usable spaces"?
Planned/future Photovolatic installation
NC-2009 EAc2:On-site renewable energyposted by Stacey Olson on
I'm working on a project that has installed the infrastructure to support a PV array, and is pursuing Enhanced Commissioning.