GBES Resources for WELL AP Exam

WELL v1 Building Standard Tip Sheet
posted by  Brian Salazar  on 

Hi all - For what it's worth, GBES now has a slide deck and flash cards available for $34.95 from their web site to use as a study guide for the WELL AP exam.

4
President, LEED AP, WELL AP
Entegra Development & Investment, LLC
LEEDuser Premium Member
43 thumbs up
Wed Oct 12, 2016, 5:42 pm

Mixed Use Residential plus hotel V4 Version?

LEED Rating System Selection
posted by  Beth Mosall  on 

Project is on an urban site, 1.5 acres, brownfield, will be fully built out with a 2 level parking deck with retail on two sides, on top of which 3 buildings and a terrace garden will be built.

2
Tue Oct 11, 2016, 6:44 pm

LEED 2009 DES Projects - Rule Change - August 2016

NC-2009 EAp2:Minimum Energy Performance
posted by  Matt Edwards  on 

I'm working on a project on a collegiate campus that utilizes district chilled water and steam, and I have run into what appears to be a rule change that was snuck into the v2009 Minimum Energy Per

5
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Oct 6, 2016, 6:32 pm

Material and Resource Calculator

CI-2009 MRc3.2:Materials Reuse—Furniture and Furnishings
posted by  Angela Feulner  on 

Can someone please explain the difference between 'Total sustainable materials cost' and 'Total materials cost' on the Material and Resource Calculator?

2
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Thu Oct 6, 2016, 3:23 pm

Issue with LEED Forms

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Sara Zoumbaris  on 

A few projects that I am as team member on have recently experienced a LEED Online form issue where information "disappears." I am curious if other folks have had this issue and how have you have a

4
Director of Sustainability
Fentress Architects
LEEDuser Expert
224 thumbs up
Thu Oct 6, 2016, 3:03 am

Green Power Contract through vendor

Retail-NC-v4 EAc7:Green power and carbon offsets
posted by  Joanna Ruiz  on 

I am working with a corporate client, who uses a third party company to seek and procure all their utility contracts.

3
Default Avatar
Project Manager, LEED AP
Wallin/Gomez Architects
LEEDuser Basic Member
0 thumbs up
Wed Oct 5, 2016, 1:21 pm

Definition of "bus line"

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Michael Kennedy  on 

Our project is on a college campus that is within 0.15 mile of a bus stop. It is served by one bus system. It's a public, not student-only system.

2
Senior Principal | Director of Sustainability Integration
SmithGroup
LEEDuser Expert
43 thumbs up
Tue Oct 4, 2016, 12:20 pm

What defines complex occupancy?

NC-2009 PIf3:Occupant and Usage Data
posted by  Jeannie Rueter  on 

I'm working on a conference center major renovation where the employees work 40 hours per week.

3
Default Avatar
Green Building Analyst
Ausonio Incorporated
LEEDuser Basic Member
3 thumbs up
Wed Sep 28, 2016, 2:06 pm

Daylight controls / sensors vs Occupancy Sensors or Both?

CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controls
posted by  Katie Peterschmidt  on 

Hello all - We have a CI project that has "Occupancy Sensors" around the perimeter of the space within 15' of the windows.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Sep 27, 2016, 6:31 pm

MEP Materials

CI-2009 MRc4:Recycled Content
posted by  Peter Doo  on 

I thought I had seen a recent post or article that some MEP materials could now be included in the materials calculation; ductwork or piping for example. Now I can't locate the reference.

3
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Tue Sep 27, 2016, 2:52 am