Included wooded area in LEED boundary?

NC-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Erica Downs  on 

The project is on a college campus, and the site itself if previously developed.

3
Default Avatar
LEED Consultant
The Green Engineer
LEEDuser Basic Member
188 thumbs up
Thu Nov 3, 2016, 9:11 pm

exemplary performance

ND-v4 INc1:Innovation
posted by  Ian Scott  on 

I purchased my v4 reference guide last year and the listing of exemplary performance options differs in the table 5: Scorecard and policy areas and the information listed under each credit.

2
LEED AP-ND, Principal
Criterion Planners
LEEDuser Expert
231 thumbs up
Wed Nov 2, 2016, 9:27 pm

CHP - Approach

NC-2009 EAp2:Minimum Energy Performance
posted by  Victoria Watson  on 

Hi, I have a project with a CHP and I am unsure how to model in line with requirements. It is to be constructed as part of the current project and will be in the LEED boundary.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4458 thumbs up
Mon Oct 31, 2016, 7:51 pm

Applicable spec divisions for MRc3

Healthcare-v2009 MRc3:Sustainably sourced materials and products
posted by  Chris Sanders  on 

Using CSI divisions as a basis, does MRc3 only apply to Div. 03-10, and parts of Div. 31-32? I can't seem to find direction, although I'm sure it exists! Thanks in advance for your help.

2
Default Avatar
VP of Innovation
Sustainable Investment Group
LEEDuser Basic Member
110 thumbs up
Thu Oct 27, 2016, 2:36 pm

Decorative Exterior Lighting

NC-2009 EAp2:Minimum Energy Performance
posted by  Saif Abdulameer  on 

Hi everyone, I am working on a project that has exterior decorative lights such as tree lights, small umbrella lights etc.

2
ASHRAE BEMP HBDP - LEED GA, Building Performance Consultant
Zonda
LEEDuser Basic Member
14 thumbs up
Wed Oct 19, 2016, 9:57 pm

New Option - Walking Path

Pilot-Credits EQpc78:Design for active occupants
posted by  Garrett Ferguson  on 

On a LEED-CI project where the interior will be renovated, the project owner encourages walking. A walking path has been provided that overlooks an atrium and is daylit with a skylight.

2
Default Avatar
Architect
Gresham Smith & Partners
LEEDuser Basic Member
6 thumbs up
Wed Oct 19, 2016, 6:05 pm

certified wood credit

NC-2009 MRc7:Certified Wood
posted by  Shawn Keith  on 

My project specs have put casework into division 12. Do I have to include these in my calcs for MR C 7?

2
Default Avatar
Kohout Woodwork, Inc
LEEDuser Basic Member
8 thumbs up
Tue Oct 18, 2016, 6:53 pm

Permanent entry way to retail space in a mid-rise multi-family

CI-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Morteza Kasmaei  on 

This is an eight-story apartment building that is pursuing LEED-NC 2009 and contains future retail spaces in the ground floor.

3
Principal
Climatic Design Inc.
LEEDuser Basic Member
18 thumbs up
Mon Oct 17, 2016, 5:29 pm

Calculating MRc4 - Recycable Material Credits

NC-2009 MRc4:Recycled Content
posted by  Richard Metts  on 

Please help me to clarify the following cost scenario's as they relate to calculating the MRc4 Material Credits. 1) Fabricated Structural Steel - Do you use the whole cost for the fabricated steel

9
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Sat Oct 15, 2016, 4:21 pm

WELL Building Credits used for LEED ID Credit

WELL v1 Building Standard Tip Sheet
posted by  Laura Steinbrink  on 

Is it possible to achieve a LEED Innovation credit for pursuit of a WELL Building credit?

3
Assistant Project Manager, LEED AP BD+C, WELL AP, CPHC
The Green Engineer, Inc.
LEEDuser Basic Member
7 thumbs up
Thu Oct 13, 2016, 8:34 pm