Circulating Fans

NC-2009 EAp2:Minimum energy performance
posted by  Victoria Watson  on 

Hi, I have some fans In my building which operate to circulate air. They are low speed when occupied and then ramp up to full speed with Temperature goes above 80F.

3
Wed Jan 4, 2017, 4:42 pm

Pilot Credit 87: Verified C&D Recycling Rates

Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Rates
posted by  Sara Greenwood  on 

Hello, I am working on a project located in San Jose which has hired a waste hauler that undergoes third-party verification to confirm their waste diversion rates.

2
Default Avatar
President
Genesis Design Inc
LEEDuser Basic Member
7 thumbs up
Tue Jan 3, 2017, 4:49 pm

Mechanical Ventilation for Multifamily Highrise Bedrooms

NC-2009 IEQp1:Minimum indoor air quality performance
posted by  Neil Sen  on 

I'm working on a Multifamily Highrise building. The bedrooms will not have operable windows, so it looks like they need to be mechanically ventilated.

2
Energy Analyst & Energy Systems Design Engineer
HKS
LEEDuser Expert
7 thumbs up
Tue Jan 3, 2017, 2:01 pm

Health and Safety Specialist

Pilot-Credits EQpc44:Ergonomics approach for computer users
posted by  Marissa Hebert  on 

The credit requirements state that the team should "Engage an Ergonomist or Health and Safety Specialist". What is a Health and Safety Specialist? Is this someone with Ergonomics training?

2
Wed Dec 28, 2016, 9:51 pm

VOC limits?

NC-v4 EQc2:Low-emitting materials
posted by  Erin Holdenried  on 

Where is the VOC limit table for wet-applied products? I can't find any tables or mention of the referenced standards for VOC limits in the Reference Guide . . .

2
Default Avatar
Project Manager
Entuitive
LEEDuser Basic Member
19 thumbs up
Fri Dec 23, 2016, 8:43 am

Modeling district purchased heat as hot water instead of steam

NC-2009 EAp2:Minimum energy performance
posted by  Vernon Smith  on 

I am modeling a 50,000 sf college cafeteria. The campus central plant boiler will provide steam to the cafeteria through a utility tunnel at basement level.

5
Principal Engineer
Smith Energy Engineers, LLC
LEEDuser Basic Member
0 thumbs up
Thu Dec 22, 2016, 3:53 pm

shower in adjacent existing building

NC-2009 SSc4.2:Alternative transportation - bicycle storage and changing rooms
posted by  Lyle Axelarris  on 

Does anyone have any experience using the showers in an existing non-LEED building adjacent to the new LEED building for this credit?

16
Thu Dec 22, 2016, 2:57 pm

Financial support option

EBOM-v4 SSc1:Site development - protect or restore habitat
posted by  Tracy Smith  on 

Hi, Just want to make sure I'm understanding this point correctly.

10
Lead Sustainability Consultant
Eight Associates
LEEDuser Basic Member
0 thumbs up
Wed Dec 21, 2016, 11:11 pm

Existing building demolition

Healthcare-v2009 MRc2:Construction waste management
posted by  Micah Vainikka  on 

I work for a construction company that is building a new hospital for a client.

2
Tue Dec 20, 2016, 7:48 pm

CxA Allowed to be Hired by GC?

CI-2009 EAc2:Enhanced commissioning
posted by  LUCY WILLIAMS  on 

Hi, Does the GBCI accept the Cx Agent for the Enhanced Commissioning credit to now be hired by the Contractor in a design-build scenario? In reading Interpretation #10244, it seems this is now all

2
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Thu Dec 15, 2016, 7:07 pm