Circulating Fans
NC-2009 EAp2:Minimum energy performanceposted by Victoria Watson on
Hi, I have some fans In my building which operate to circulate air. They are low speed when occupied and then ramp up to full speed with Temperature goes above 80F.
Pilot Credit 87: Verified C&D Recycling Rates
Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Ratesposted by Sara Greenwood on
Hello, I am working on a project located in San Jose which has hired a waste hauler that undergoes third-party verification to confirm their waste diversion rates.
Mechanical Ventilation for Multifamily Highrise Bedrooms
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Neil Sen on
I'm working on a Multifamily Highrise building. The bedrooms will not have operable windows, so it looks like they need to be mechanically ventilated.
Health and Safety Specialist
Pilot-Credits EQpc44:Ergonomics approach for computer usersposted by Marissa Hebert on
The credit requirements state that the team should "Engage an Ergonomist or Health and Safety Specialist". What is a Health and Safety Specialist? Is this someone with Ergonomics training?
VOC limits?
NC-v4 EQc2:Low-emitting materialsposted by Erin Holdenried on
Where is the VOC limit table for wet-applied products? I can't find any tables or mention of the referenced standards for VOC limits in the Reference Guide . . .
Modeling district purchased heat as hot water instead of steam
NC-2009 EAp2:Minimum energy performanceposted by Vernon Smith on
I am modeling a 50,000 sf college cafeteria. The campus central plant boiler will provide steam to the cafeteria through a utility tunnel at basement level.
shower in adjacent existing building
NC-2009 SSc4.2:Alternative transportation - bicycle storage and changing roomsposted by Lyle Axelarris on
Does anyone have any experience using the showers in an existing non-LEED building adjacent to the new LEED building for this credit?
Financial support option
EBOM-v4 SSc1:Site development - protect or restore habitatposted by Tracy Smith on
Hi, Just want to make sure I'm understanding this point correctly.
Existing building demolition
Healthcare-v2009 MRc2:Construction waste managementposted by Micah Vainikka on
I work for a construction company that is building a new hospital for a client.
CxA Allowed to be Hired by GC?
CI-2009 EAc2:Enhanced commissioningposted by LUCY WILLIAMS on
Hi, Does the GBCI accept the Cx Agent for the Enhanced Commissioning credit to now be hired by the Contractor in a design-build scenario? In reading Interpretation #10244, it seems this is now all