Forum quick links
College Campus, mixed use buildings, and public accessibility
NC-2009 SSc2:Development Density and Community Connectivityposted by Erica Downs on
We are attempting Op. 2: Community Connectivity on a college campus. We have plenty of services on campus that are open to the general public to meet the requirements.
Additional Flush-out Duration after Air Test Failed
Healthcare-v2009 IEQc3.2:Construction IAQ management plan - before occupancyposted by Kim Lombard on
If Option 2 for an air test fails, the remedy is .... "....conduct an additional flush-out with outside air and retest the noncompliant concentrations. Repeat until all requirements are met.
residence scenario emission test
Homes-v4 EQc7:Low-emitting productsposted by Danielle McMahon on
Would an Greenguard Gold certified adhesive product eligible for the LEED v4 Home low-emission credit? In other words, if a product claim that they've performed the emission evaluation test that i
Conformity of commingled facility process
NC-v4 MRc5:Construction and demolition waste managementposted by William Leblanc on
The commingled waste facility that process our project waste work as follows: They weight the container once it arrives from job site, then separate the diffents matrials into percentage of the loa
Galvanize Repair
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Sean Kirk on
Hello, My project contains interior galvanized steel which will need repairing during installation.
Garbage Truck Maintenance Garage
NC-v4 SSc5:Heat island reductionposted by Edgar Arevalo on
Even though the vehicles parked inside the garage are garbage trucks and not vehicles used by FTE employees, can I still consider those parking spaces for Option 2?
proposed model fan power
CS-2009 EAp2:Minimum Energy Performanceposted by jack evans on
We have received our Design Final Review comments and the LEED reviewer has denied EAp2 because the proposed equipment capacities do not match the equipment schedules on the HVAC drawings.
Company providing Shuttle to Train Station
NC-2009 IDc1:Innovation in Designposted by Joyce Kelly on
A warehouse / distribution center facility just bought a shuttle to transport employees to / from train station (more than 2 miles away.) We understand this doesn't meet the intent of SSc4.1, but i
LI ID #10421 allows 90.1-2010 for v2009 but how to document it?
NC-2009 EAp2:Minimum Energy Performanceposted by RETIRED on
One of my projects is considering using LI ID #10421 (http://www.usgbc.org/content/10421) that allows v2009 projects to use ASHRAE 90.1-2010 with an adjusted point scale.
Do aerosol rust-inhibitor paints fall under LEED guidelines?
NC-v4 EQc2:Low emitting materialsposted by Debra a. Lombard on
we have steel doors that will have a very nasty primer put on in the shop that has carbon black, formaldehyde, cobalt based chemical and other nasty stuff.