Forum quick links
LEED NC for Most of a Building
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Nathan Gauthier on
Does anybody have any thoughts on certifying an existing building undergoing a major renovation as LEED NC but excluding a relatively small portion of support space that is managed by a different e
Core & Shell tenant retail space in mixed-use building
NC-2009 IEQp1:Minimum IAQ Performanceposted by Erica Downs on
Our project is a high-rise apartment building with C&S retail on the ground floor.
Canadian LEED market
posted by Nirwair Singh Bajwa on
Hi LEED professionals, I found a trend in Canadian LEED registered and certified projects from CaGBC website.
Glass in Jalousie-style
NC-2009 EAp2:Minimum Energy Performanceposted by James Lee on
Hi, Is there specially I have to concern when I define the fenestration's properties for jalousie-style glass in energy modeling? Thanks in advance
Option 2 "reduction below industry average"
CI-v4 MRc3:Building product disclosure and optimization - environmental product declarationsposted by Jennifer Rinkus on
For option 2 it states the products must demonstrate impact reduction below industry average in at least 3 categories. Where do I find those "industry averages" to know if my products qualify?
Project boundary dilemma: City stormwater permit vs LEED area
NC-2009 PIf2:Project Summary Detailsposted by Craig Wilson on
Hi! Our site is located in Minneapolis and is a rather complex historic urban infill site. Three quarters of a former industrial site's entire city block was redeveloped by our client.
Alternative to Table 1.4
NC-2009 EAp2:Minimum Energy Performanceposted by Ben Cullum on
When submitting energy models to NYC we have to fill out a form called an EN-1 that is very similar to Table 1.4 and provides the same information. Can we provide the EN-1 in place of Table 1.4?
Services on a college campus
NC-2009 SSc2:Development Density and Community Connectivityposted by Megan Recher on
We are working on a college campus and does anyone know if a college bookstore could count as retail? It is open to the general public.
EAc5 Option 3
NC-2009 EAc5:Measurement and Verificationposted by Jeff Wiedmeyer on
I have a client who has chosen to meet MPR#6 by selecting Option 2: USGBC Approved Data Template.
Furniture & Furnishings in MR Credits
CI-2009 MRc4:Recycled Contentposted by Patty Lloyd on
In LEED v3 CI are furniture and furnishings budget still required to be included in the MR credits 4,5, & 6?