Forum quick links
Using WELL certification for ID strategies
CI-v4 INc1:Innovationposted by emily reese moody on
We have a CI v4 project that is also pursuing WELL and Fitwel certifications.
furniture heights
CI-v4 EQc8:Quality viewsposted by emily reese moody on
I don't see anywhere in the reference guide...is there a specific height restriction for furniture (such as in an open office area) that items should be under in order to allow the space to count t
Can this be achieved with bus service only?
CS-v4 LTc5:Access to quality transitposted by Sara Mae Parker on
Does anyone know if this credit can be achieved with bus service alone?
LEED Review - Simulation Worst-Case Not Accepted
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by GBD Architects on
I submitted a simulation output for our core and shell building.
Is this plant qualified as a DES?
NC-v4 EAp2:Minimum energy performanceposted by Aru Sau on
1. We registered the project as Campus consisting 3 Buildings. Central Plant Building and the future building is not included in the LEED boundary. 2.
EPD expiration date
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Harry Flamm on
Since EPDs have an expiration date, and though we may have specified a product while it is valid, it may get constructed in the building after it's expiration date.
FEV/LEV Signs
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Karl Heitman on
Does the sign have to be a post type? Could it be letters painted on the ground?
Process Water Uses
NC-v4 WEp2:Indoor water use reductionposted by Claire DeCamp on
Our projects frequently have process water uses in labs or other equipment that is not listed here, as well as laboratory faucets, or hose wash down areas. How are these to be handled in v4?
EPD Credits - Exemplary Performance
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Chris Brown on
All three of the EPD credits have two options each that can be pursued individually for one point or together for a total of two points for each EPD credit.
Exemplary Performance for No Parking
NC-v4 LTc7:Reduced parking footprintposted by Risto Beatty on
If a project has no parking whatsoever, new or existing, can it claim exemplary performance for a 100% reduction?