Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

MR c7 forms

NC-2009 MRc7:Certified Wood
posted by  Mark Ramsey  on 

As a millwork subcontractor with a FSC COC number where can we go to get detailed information on how and what is required to fill out the MRc7 forms.

1
Mon Apr 13, 2015, 3:04 pm

Lighting Levels

Pilot-Credits EQpc78:Design for active occupants
posted by  Henry Richardson  on 

Hello, We received a review comment requesting lighting level diagrams. Are alternatives acceptable, including drawings showing fixture selection or lamp output? Thanks, Henry

0

Feedback on test results?

CI-v4 EQc4:Indoor air quality assessment
posted by  Joanna Switzer  on 

Hey all, I've heard informally from one lab that they are seeing a number of v4 projects fail their IAQ tests - appears the newly introduced glycol level thresholds are a common obstacle.

3
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Sep 1, 2017, 12:19 am

FAR for parks with pavillion

NC-v4 SSc3:Open space
posted by  nancy picard  on 

I would like to know if there have ever been special considerations for the FAR calculation, like when considering a municipal pavilion with a park for example?

3
Thu Aug 31, 2017, 2:02 am

The Eco Declaration

CI-v4 MRc3:Building product disclosure and optimization - environmental product declarations
posted by  Kristopher Croghan  on 

Many of our client's printers have received The Eco Declaration, an ECMA-370 Standard. Does this comply with the LEED 4 criteria?

2
CEO
Green Commons, LLC
LEEDuser Expert
586 thumbs up
Wed Aug 30, 2017, 12:51 pm

Heated Bus Storage

NC-v4 EAc2:Optimize energy performance
posted by  Victoria Watson  on 

Hi, I am trying to work out the best way to model a heated (cold climate) bus storage facility in the baseline.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Aug 30, 2017, 3:25 am

Using different energy rates between CHP Proposed and Baseline

NC-v4 EAp2:Minimum energy performance
posted by  Mark Benson  on 

I know that the 90.1 and the LEED Reference Guide generally tell you to use the same utility rate structures for both the Proposed and Baseline models.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Aug 29, 2017, 8:38 pm

Lease requirements for this credit

CS-2009 IEQc2:Increased Ventilation
posted by  Troy Glasner  on 

Hi, I am just wondering what specific lease requirement language would be needed for this credit.

2
Tue Aug 29, 2017, 6:32 pm

LEED lease agreement for CS

CS-2009 IEQc2:Increased Ventilation
posted by  Alfonzo Collins  on 

I am working on a core & shell building. The owner will only be installing AHUs for a few core & shell spaces.

2
President
E3 Eco Group Inc.
LEEDuser Basic Member
3 thumbs up
Tue Aug 29, 2017, 6:24 pm

Can Building Envelope CxA be the acoustical engineer

NC-v4 EQc9:Acoustic performance
posted by  Edgar Arevalo  on 

I know under LEED that the design engineers cannot also be the Cxa, but does that also apply for an entity/company who is the building envelope CxA but can also be the acoustical engineers?

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Aug 29, 2017, 5:06 pm