Conflict of interest?
NC-v4 EQc4:Indoor air quality assessmentposted by emily reese moody on
Are there any conflict of interest concerns if a contractor hires the air testing company versus the owner or A/E?
Equipment Baseline
Pilot-Credits EApc3:Medical and process equipment efficiencyposted by LUCY WILLIAMS on
Our team is considering pursuing this credit, but it is unclear what baseline the specified equipment is to be measured against.
Daylight Measurements disappointing
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Joyce Kelly on
1.Measurements were disappointing July 15 because shading structures are doing their job and blocking direct sunlight - a blessing in Southern Arizona. Should we wait until the nx.
Concrete coating
CI-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Katie Diedrich on
Currently working on a job which is under Commercial Interiors v2009. There is an existing concrete floor which is going to be sealed. Which coating type would this need to be classified as?
Previously Submitted Documentation
CI-2009 PIf5:Previously LEED Certified Detailsposted by CHRISTIAN LUTJEN on
Hello, we are embarking on a new LEED 2009 C.I. project in a building that has already achieved a LEED Gold rating for Core and Shell.
Prefinished wood flooring
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Brianna Brandsen on
when installing prefinished wood flooring in a building that is attempting LEED certification, does the finish need to be compliant with LEED regulations, as you are not applying the finish on site
FTE Consistency Pertaining to IEQp1
NC-2009 IEQp1:Minimum IAQ Performanceposted by Spencer Eldredge on
The need to keep FTEs consistent through all credits is stressed though in the case of IEQp1 where for Mechanical Ventilation, table IEQp1-3, for code compliance based on square footage, the Pz (zo
2-seat Reception Area in Middle School
Schools-2009 IEQc6.1:Controllability of Systems—Lightingposted by Sara Zoumbaris on
Hi all, I feel like I am second guessing myself with this one. I have a middle school with individual work stations including mostly private offices and one reception area that has 2-seats.
n/a
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Donna Juselis on
deleted
Heat Island Reduction when adjacent to existing building on lot
CS-v4 SSc5:Heat island reductionposted by Nadia Bini on
Hello, our project is connected to an existing building on the same lot. Can we exclude the existing building's roof surface from our credit calculations?