Testing strips - other manufacturers
Pilot-Credits INpc137:Cleaning and Disinfecting Your Space for Emerging Pathogensposted by Glen Boldt on
Has anyone had any experience with other manufacturers for the testing strips. Also, what has been the adoption rate of this testing protocol with cleaning staff?
TRUE Waste Certification Advisor Recommendation
EBOM-v4.1 MRp3:Waste Performanceposted by Daniel Bertschinger on
Hello Everyone!
I would like some recommendation of companies that can act as advisors for the TRUE Waste certification for an operating manufacturing plant.
Kindly regards,
Any way to download LEED project data?
posted by Sustainability Ballinger on
I'm working on creating a database of our firm's project data, specifically around our sustainability efforts. I don't currently see any way on the LEED Online website to download in a data-c
EV space accessibility
NC-v4.1 LTc8:Electric Vehiclesposted by Lawrence Rennell on
Do all EV spaces required to be available to the general public?
Non-linear primary direction of travel.
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Michelle Halle Stern on
Our entry includes a centered revolving door with people doors on either side.
MRpc103 Integrative Analysis of Building Materials
NC-v4 INc1:Innovationposted by Lisa Bolle on
As our project team was performing the analysis of three products, we realized that another potentially useful strategy would be to compare three similar products and use the integrative analysis w
Pilot credit Requirement
Pilot-Credits SSpc55:Bird collision deterrenceposted by on
Commenting to comply with credit requirements. Credit language is clear and the team was able to implement without trouble. The project used a highly reflective glazing to comply.
High Rise Residential
NC-v4 EAc3:Advanced energy meteringposted by Megan White on
We have a 24 story high rise residential apartment project that wants to pursue this credit however we are looking for guidance as this seems more geared towards commercial office projects with mul
Future open space preservation- Campus project
NC-v4 SSc3:Open spaceposted by Andy Rhoades on
My question is regarding a multi-phased campus project. Are we able to count future planned open space towards the credit threshold, and if so, what documentation would this require (i.e.
Lighting Control in blood draw spaces
Healthcare-v4 EQc6:Interior lightingposted by Heather Belsey on
For the lighting credit you need to have individual controls at 90% of patient positions. LEED defines patient positions as: