Envelope Categorization

CS-2009 MRc1:Building Reuse—Maintain Existing Walls, Floors and Roof
posted by  Russell Philstrom  on 

Hello All-- I have two associated questions: Part 1: I'm working on a project in which a previously open arcade is being enclosed and am wondering about how to calculate envelope area.

0

Exemplary Performance

Schools-2009 EAc6:Green Power
posted by  Kevin Taterus  on 

LFS 2009 rating system - Our Owner on the project received a quote from a renewable energy provider that stated we could get three points total if we purchased 100% of the energy from renewable sou

1
Tue Jul 26, 2016, 6:26 pm

Assesment rooms at rehabilitation Center

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Saju Varghese  on 

Hello everyone. I was wondering if triage assessment rooms need to be considered workstations since this is where patients are going to be evaluated before admission.

1
Fri Nov 27, 2015, 9:29 pm

SSc2 - Can on-campus uses apply towards "basic services"?

NC-2009 SSc2:Development Density and Community Connectivity
posted by  Jordan Petersen  on 

We are currently attempting to achieve SSc2 Development Density + Connectivity on a University Campus for the construction of a number of student housing units.

1
Wed Oct 26, 2016, 2:19 pm

New to LEED Submitals

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Joel Clonch  on 

I have a mill-work submittal that requests : LEED Submittals: 1. Product Data showing VOC content does not exceed 30 g/L for wood adhesives and 80 g/L for contact adhesives. 2.

1
Tue Jan 17, 2017, 2:31 pm

Historic Bldg Renovation being done in phases, Bldg reuse calcs

NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roof
posted by  Debra a. Lombard  on 

I'm working on behalf of a GC on a complicated historic renovation and new construction project that's being done in several phases with separate contracts between Owner and GC.

1
Mon Mar 28, 2016, 6:39 pm

WEc2: Time frame for functional reclaimed water systems

NC-2009 WEc2:Innovative Wastewater Technologies
posted by  Brian Bartholomew  on 

Under the Bird's Eye View here for WEc2, there is a citation of LEED Interpretation #10012 made on 05/09/2011 which states "projects may only count future infrastructure such as reclaimed water sys

1
Sat Aug 26, 2017, 9:52 pm

MRc5 Material Tracking/Documentation

CS-2009 MRc5:Regional Materials
posted by  Maggie Hogan Skaug  on 

RE: usgbc.org/leedonline, CS2009 MRc5 I do not see a form or calculator for material tracking or other forms/upload requirements for this credit documentation.

0

searching out no voc floor sheathing and mdf

NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Products
posted by  Phil Vanderloo  on 

I was hoping someone can direct me to a resource, available to Sacramento Ca., for compliant, (no voc or urea formaldehyde), 1 1/8" T&G plywood floor sheathing. Thank You

1
Mon Jun 13, 2016, 12:15 am

Phased Flush Out

Schools-NC-v4 EQc4:Indoor air quality assessment
posted by  Cynthia Kaplan  on 

We have a phased reno/add school project that would prefer to earn IEQ 4 by way of post occupancy flush out.

1
Mon Aug 28, 2017, 2:09 pm