Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

No Tenant Fit Out

CS-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Kimberlyn Caoagas  on 

I'm working on a 12-story office building. To my knowledge, there are no concrete tenant fit outs yet (since the tenants have yet to be known). Would the project be able to pursue IEQc8.1/8.2?

1
Wed Oct 8, 2014, 1:22 pm

Does mech engineer need to be PE to sign the "signature' box ?

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Matt Dem  on 

Shall the person who enters his/her initials under signatory section ( for example IEQp1 or EAp2-1, 2-2, 2-3 ) be registered mechanical engineer (PE) ?

1
Mon Dec 29, 2014, 2:40 pm

ADA Parking Exclusion

CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Daniel Joseph  on 

Can we exclude ADA parking from the total parking capacity when considering the preferred parking 5% max?

1
Tue Mar 10, 2015, 6:27 pm

Dynamic Plaque for ID: Green Education

Discuss the LEED Dynamic Plaque and Arc
posted by  Jennifer Preston  on 

Has any Project Team achieved the ID: Green Education credit with the LEED Dynamic Plaque satisfying requirement #1: "Comprehensive signage program built into the building's spaces to educate the

1
Fri Nov 27, 2015, 10:00 pm

Download Forms

NC-2009 PIf1:Minimum Program Requirements
posted by  Ralph Bicknese  on 

Hello, I am currently working on a project in which we need independent specs for LEED and we are considering to facilitate the LEED forms to the Contractors so they can get familiar with them bef

1
Sat Jan 16, 2016, 3:23 am

Submitting a Product to meet LEED Certification

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Jeremy Henak  on 

Looking at what the process is for submitting a product for LEED certification. Thanks, Jeremy

1
Thu Dec 8, 2016, 5:49 pm

LEED CI for Retail - MRp1

Retail-CI-v2009 MRp1:Storage and collection of recyclables
posted by  Gail Napell  on 

does anyone have an example of a waste stream study that meets these requirements? there isn't one in the LEED Reference Guide. thanks all!

1
Wed Aug 30, 2017, 2:23 pm

Compost as an additional recyclable

NC-v4 MRp1:Storage and collection of recyclables
posted by  Sara Zoumbaris  on 

Our project has company-wide recycling programs set up which collect batteries, mercury containing lamps AND electronic waste, however the collection boxes are not out in the open as the collection

1
Thu Mar 2, 2017, 5:24 pm

LEED V4 DATA CENTER

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Caroline Vallieres  on 

There is a new data center extension to an existing building of a different use (office). The extension is accessible via a corridor. The buildings do share an electrical box.

1
Mon Dec 8, 2014, 6:21 pm

Sedum as native plants

CS-2009 WEc1:Water Efficient Landscaping
posted by  Dave L  on 

Hi, I have been advised that the sedum plants would meet this credit on green roofs due to the fact that the plants would be indigenous for landscaping in general.

0