Forum quick links
Planned City Bus Stop and Shuttle?
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Cynthia Estrada on
I've seen a few postings but no solid information on whether or not GBCI will accept verified plans for either a shuttle bus and/or a planned additional bus stop to an existing route.
Approach for documentation with 2 Commissioning Agents
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Aishwarya Balagopal on
The project is registered as a Campus project with a Master Site including 4 new buildings, an underground parking structure, and landscape improvements.
Building Envelope Trade Off
NC-2009 EAp2:Minimum Energy Performanceposted by James Lee on
I have 2 questions about EAp2. 1.
School outisde of project boundary
ND-Plan-v4 NPDc15:Neighborhood schoolsposted by Sarah Kearney on
The requirements do not specify if the school has to be within the project boundary.
Energy and Atmosphere credit #5
NC-2009 EAc5:Measurement and Verificationposted by James Goldfield on
I had a question in regards to the energy and atmosphere credit #5 which states a need for a measurement and verification plan.
Need for consistent numbering system across all rating systems
posted by Lyle Axelarris on
I definitely like having credit numbers as they save a lot of time in communication and reference.
Deck over parking; do I have this right?
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Susan Di Giulio on
Our project has multiple levels of parking under a large podium plaza. I believe this is what what the Reference Guide (p 112) refers to as a "deck", right?
Changing Innovative Design Credits during Review Process
posted by Ralph Bicknese on
We are in the process of submitting a project for LEED construction credit documentation.
v2009 Project to comply using Building Automation System?
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Sara Greenwood on
Hello, I do not see any feedback on the use of incorporating a building automation system where building users can inform the building engineer to change light levels or temperature by calling or m
Master's Research Survey
Pilot-Credits MRpc76:Material ingredient reportingposted by Vibha Pai on
I am conducting this survey in affiliation with University of Cincinnati in support of my hypothesis for my Master's thesis. It would just take 10-15 minutes of your time.