Forum quick links
EPD Option 2 - Compliance
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Alexa Stone on
For Option 2 - How do you determine credit compliance with an industry-wide EPD?
Accounting for Shower Use by non-building occupants
EBOM-2009 WEp1:Minimum indoor plumbing fixture and fitting efficiencyposted by Deborah Lucking on
We have a campus project where FTEs from a number of buildings have access to showers and lockers in a separate "clubhouse" building.
Refrigerants outside of the building, but still on site
EBOM-2009 EAp3:Fundamental refrigerant managementposted by Levi Jimenez on
We have a property with a commercial ice machine, which uses more than 0.5 Lb CFC 502 refrigerant.
Showers in group projects
NC-2009 SSc4.2:Alternative transportation - bicycle storage and changing roomsposted by Stacey Olson on
This piggy-backs to my previous comment about bike rack locations. Per the published Campus/Group Eligibility Credits & Prerequisites for LEED 2009, SSc4.2 - Alternative Transportation Bicycle
Provide the source of data
Healthcare-v2009 MRc4.2:PBT source reduction - lead, cadmium and copperposted by Matt Luedders on
Under the lead section, the credit language includes the requirement to "Upload lead documentation.
Crawlspace and Attic Classification
NC-2009 EAp2:Minimum energy performanceposted by Joseph Chappell on
I am working on an existing building renovation where there is a significant amount of building floor area that is crawlspace and attic area.
V4 EBOM - Commissioning
EBOM-v4 EAc2:Existing building commissioning—implementationposted by Meier Corporate Account on
Good Afternoon, Our manufacturing plant was constructed in 2014-2015 and went online in August of 2015.
Planned City Bus Stop and Shuttle?
NC-2009 SSc4.1:Alternative transportation - public transportation accessposted by Cynthia Estrada on
I've seen a few postings but no solid information on whether or not GBCI will accept verified plans for either a shuttle bus and/or a planned additional bus stop to an existing route.
Approach for documentation with 2 Commissioning Agents
NC-2009 EAp1:Fundamental commissioning of building energy systemsposted by Aishwarya Balagopal on
The project is registered as a Campus project with a Master Site including 4 new buildings, an underground parking structure, and landscape improvements.
Building Envelope Trade Off
NC-2009 EAp2:Minimum energy performanceposted by James Lee on
I have 2 questions about EAp2. 1.