Forum quick links
2-seat Reception Area in Middle School
Schools-2009 IEQc6.1:Controllability of systems - lightingposted by Sara Zoumbaris on
Hi all, I feel like I am second guessing myself with this one. I have a middle school with individual work stations including mostly private offices and one reception area that has 2-seats.
n/a
NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by Donna Juselis on
deleted
Heat Island Reduction when adjacent to existing building on lot
CS-v4 SSc5:Heat island reductionposted by Nadia Bini on
Hello, our project is connected to an existing building on the same lot. Can we exclude the existing building's roof surface from our credit calculations?
Plant Design for Proposed bldg
NC-2009 EAp2:Minimum energy performanceposted by Julian Park on
If a new building will be served by an existing chiller plant that already serves an existing building, does the Plant design for the Proposed Alternative need to model the full chiller size, even
Paint Certification
NC-v4 EQc2:Low-emitting materialsposted by Rai Galang on
Just want to check if Green guard certification for the paint is approved for the LEED when applying for the Credit instead of Green Seal (GS-11) certification?
Ceiling Step Down
NC-v4 EQc8:Quality viewsposted by Kim Lombard on
Does anyone have a good sense of how to treat step down ceiling heights in calculating the interior distance qualifying for quality views?
Upload IEQc3.2-1. Provide the IAQ Management Plan...
NC-2009 IEQc3.2:Construction IAQ management plan - before occupancyposted by Zach Hoffman on
Hello, I have been successfully completing IAQ Testing under Option 2 for a few years now and always wondered about this section of the credit template.
LEED O+M: Multifamily
NC-v4 MPR3:Must comply with project size requirementsposted by Adam Stoker on
Where can I go to find information on the project size requirements for LEED O+M: Multifamily projects?
Option 2 for a Partially Enclosed Building (LEED NCv2.2)
NC-2009 IEQc3.2:Construction IAQ management plan - before occupancyposted by SIG - Sustainability Main Account on
We performed IAQ testing to meet IEQc3.2 on a subway station. The IAQ levels passed easily, and our approach was recognized by the LEED reviewer as an appropriate approach.
Equipment and Applicances
CI-v4 EAc2:Optimize energy performanceposted by Casey Krieg on
This question is in regards to the Optimize Energy Performance section, under the Prescriptive compliance method and more specifically the Equipment and Appliances credits. My team and I are seeki