Forum quick links
Does FloorScore apply to subfloor surfaces?
CI-2009 IEQc4.3:Low-emitting materials - flooring systemsposted by Edgar Arevalo on
I have a project where I received a submittal for a subflooring hard surface material.
Default recycled content for Aluminum or Glass?
CI-2009 MRc4:Recycled contentposted by Charles Chaloeicheep on
Hello, My project is using aluminum and glass fabrications made in China and neither fabricators has any information about the recycled content.
SS 7.2 (v2009 C+S) -- Tenant Improvements to Roof
CS-2009 SSc7.2:Heat island effect - roofposted by Justin Oldfield on
Our core and shell project has chosen a roofing material compliant with SS 7.2.
Updating documentation with consistent or more recent dates?
posted by Sara Goenner Curlee on
For various reasons, my project's Design Submittal got put on hold in 2014 after most of the work effort was done and uploaded to LEED Online.
Refurbishing of historic windows
NC-2009 MRc1.1:Building reuse - maintain existing walls, floors and roofposted by Kath Williams on
Windows in our historic building project have been removed, refurbished, glass upgraded to double-pane, low-e, etc. Can we use frames under MR c1 Building Reuse and MR c5 Regional Materials?
Project on Hold
posted by Nereyda Rodriguez on
Our project has been put on hold indefinitely by the Owner. There is a chance that it may come back in a year or two. The project is registered under NC v2009.
Required Documentation: All Projects for Site Management credit
EBOM-v4 SSc5:Site managementposted by JOHN COOK on
Hello, Is there an example of an acceptable "air quality protection log" that USGBC is looking for in this credit?
Changes during Design Review
NC-2009 EAp2:Minimum energy performanceposted by Victoria Watson on
Hi, We are currently responding to LEED Reviewer comments for a building.
CI MRc2 Concrete & Brick
CI-2009 MRc2:Construction waste managementposted by Joseph Sneed on
I have a project that has a lot of brick & concrete demolition. This will be used as "clean fill" at a Metrofill site located somewhere else and not taken to a "landfill".
Bus Line Rerouting for Adjacent Bridge Construction
NC-2009 SSc4.1:Alternative transportation - public transportation accessposted by Kevin McNulty on
Hi. My firm is working on a building that will be located right at the foot of a large bridge project that is currently in construction (estimated reopening in a few years).