Forum quick links
Water Usage for parks and open spaces
CS-2009 WEp1:Water Use Reductionposted by Deborah Lucking on
Our project is a small pavilion in a park, with tenant space for a food outlet, and (separate) restroom facilities to serve park users.
Final Cleaning
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Benjamin McGrath on
For the final cleaning bid package, in our specifications, there is no language requiring that the chemicals used have to be low VOC.
M&V Option 3 for Building Additions
NC-2009 EAc5:Measurement and Verificationposted by Mark Zoeteman on
If a LEED project boundary only includes a building addition, would the Addition natural gas, electricity and water utilities need to be separately submetered if fed from main building utility serv
SCS not yet approved?
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Erin Holdenried on
SCS certified EPDs are not yet approved?
SSc4.3: "publicly posted at the entrance of the parking area"
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Greengrade User on
Our project is a classroom and faculty office building with an occupancy calculated at 89 FTE and 707 peak transients located on an urban college campus .
Increasing Baseline Static Pressure for Sound Regulations
Schools-NC-v4 EAc2:Optimize energy performanceposted by Keith Lane on
We're working on a project where in order to comply with local noise regulation requirements, the Proposed design required indoor air handling equipment with fully ducted exhaust/intake air connect
Incomplete Space within LEED-CI Multi-Use Building
CI-2009 PIf1:Minimum Program Requirementsposted by Sara Zoumbaris on
Hello, We are working on a multi-use building that will house a hotel, residence, retail and a restaurant.
CI 2009 SS C2
CI-2009 SSc2:Development Density and Community Connectivityposted by Neil Rosen on
Can a golf course be used as a park in SS C2 Community Connectivity?
Accounting for shower use by non-occupants
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Deborah Lucking on
Ours is a campus project where FTEs from a number of buildings have access to showers and lockers in a separate "clubhouse" building.
Major Renovation prerequisites
posted by Vanessa Poirier on
Hi all, In the case of a Major Renovation project, are all prerequisites must be answered (in all categories) or only the ones for the categories affected by the project.