Forum quick links
Existing MultiFamily High Rise-Exclude Occupied Commerical Space
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Laura Steinbrink on
We have an existing 13 Story Downtown Multifamily LEED NC v2009 registered project consisting of 210,000 sf and 200 units which will be gutted.
is a tenant lease agreement applicable here?
CS-2009 IEQc8.1:Daylight and views - daylightposted by Alfonzo Collins on
I am working on a C&S office building, and I'm reading differing viewpoints on this credit and IEQc8.2. Must these credits be included in the Tenant Lease agreement?
BTU Metering for Existing HVAC
CI-2009 EAc3:Measurement and verificationposted by Jareb Ketay on
I have a tenant renovation project occupying 1 story of an existing 10 story building (
Existing Building Envelope does NOT Meet ASHRAE 90.1-2007
CI-2009 EAp2:Minimum energy performanceposted by James Keohane on
How do you meet and demonstrate requirements of EApr2 if elements of the existing building envelope does NOT meet 90.1-2007 Prescriptive measures?
Bird Collision Deterrence Monitoring Plan
Pilot-Credits SSpc55:Bird collision deterrenceposted by Ivan Romero on
Our intention is to pursue Bird Collision Deterrence under NC. Several questions: 1.
Retro-Enhanced Commissioning
NC-2009 EAc3:Enhanced commissioningposted by Christian Pegher on
Our project is on hold until the fall. The construction documents are done, and the owner just hired a CxA. They'd like to have the CxA go back through the documents now and provide feedback.
Master's Research Survey
Pilot-Credits MRpc53:Responsible sourcing of raw materialsposted by Vibha Pai on
I am conducting this survey in affiliation with University of Cincinnati for my Master's thesis in support of my hypothesis.
Baseline Ratios
CI-v4 LTc5:Reduced parking footprintposted by Kena David on
I am having a similar problem like many who have posted here with no reply. Could you please provide guidance as to how to interpret the Institute of Transportation Engineers tables?
CI: ID+C Project: Innovation in Design Credit
CI-2009 IDc1:Innovation in designposted by Bridgett Weaver on
For an CI: ID+C Project Can you can earn / achieve innovation in design credit for following BD+C Enhanced Refrigerant protocols in CI project?
How is an area/square footage assigned to a tree?
NC-2009 WEc1:Water efficient landscapingposted by Tricia Loe on
I have a plaza with 32 trees, with each in their own tree grate. I am trying to determine how to input this vegetation type into the EPA WaterSense calculator.