Forum quick links
residents of Multi-residential project
NC-2009 SSc4.2:Alternative transportation - bicycle storage and changing roomsposted by Yan-Chuan Chen on
Hi All, I am working on a multi-residential building. However, the residents number should put based on the LEED Ref. Guide or on building code?
Is it OK to use different units of measurement for MRc6 + MRc7?
EBOM-2009 MRc6:Solid waste management - waste stream auditposted by Craig Wilson on
A client had a waste audit done for MRc6 in weight (36% landfill diversion) and we analyzed MRc7 in volume (55% landfill diversion).
1 year contract?
NC-2009 EAc6:Green powerposted by Erin Holdenried on
In v2.2 is was acceptable to have a 1 yr contract as long as the total green power purchased was equivalent to 2 years of 35% electricity, or year of 70% electricity for exemplary performance.
100% OA Laboratory System
NC-v4 EAp2:Minimum energy performanceposted by Charles Daze on
I have a HVAC system with labs on it requiring 100% outside air systems. Following all the guidance in 90.1 these spaces require a dedicated Sys 5/7 because they are over 5,000 cfm.
IAQ Procedure is NOT acceptable?
CI-2009 IEQp1:Minimum indoor air quality performanceposted by James Keohane on
I recently received a Design Review comment advising that the IAQ procedure included in Chapter 6 of the ASHRAE 62.1-2007 is not an acceptable tool to demonstrate compliance.
Existing Building, Renovations Taking Place Piecemeal
CI-v4 EQc4:Indoor air quality assessmentposted by Sara Zoumbaris on
We have a university lab project that is renovating a select number of rooms, with varying materials/ systems being replaced at different times.
Garage Space - Negatively Pressurized Rooms
NC-2009 IEQc5:Indoor chemical and pollutant source controlposted by Panda Aumpansub on
Hello there, For garage spaces that are designed for CO/NO₂ monitoring and have a neutral (Exhaust air – Supply air = 0) pressurization.
Athletic Track
NC-2009 SSc2:Development density and community connectivityposted by Erica Downs on
Has anyone successfully used an Athletic Track as a "fitness center" option? Definitely open the public and seems like it should fly. Thanks!
PIf2- Project Summary Details
NC-2009 PIf2:Project Summary Detailsposted by Karly Michalowski on
What to do if project owner will not supply project budget?
Rennovation with small addition
NC-2009 EAp2:Minimum energy performanceposted by Stephanei Mezynski on
I am working on a project that is 15,00 sqft renovation and 8,000 sqft new construction (addition).