IS Pre-Consumerpercentage fo mrc4 considered for extraction Point in mrc5?
NC-2009 MRc5:Regional materialsposted by Jonathan Foley on
Hi, first time user here.
Option 3?
EBOM-v4 LTc1:Alternative transportationposted by Catalyst Partners on
Has anyone had experience with Option 3? It appears we will not get any points in Option 2 - it's a fairly isolated building where everyone drives on their own.
Option 3 - Core Performance Guide???
NC-v4 EAp2:Minimum energy performanceposted by Erica Downs on
The prescriptive path under Option 3 still references the "Advanced Buildings Core Performance Guide". However, this guide has been "sunset" by NBI and no longer exists. Typic
Gas vented fireplace
NC-2009 EAp2:Minimum energy performanceposted by Carlos Vazquez on
I have a project were there is a 24,000 Btuh gas vented fireplace. Is a wall device mostly radiant heater (70-75%) with a glass panel which does not have a fan.
LDP for EBOM Recertification - Pros and Cons?
posted by Kimberlee Dobbins on
I know of one building attempting to use LDP for EBOM recertification. Has anyone successfully achieved recertification and willing to share the experience?
Breakdown in question...
NC-v4 EAc3:Advanced energy meteringposted by emily reese moody on
I'm funneling this question on behalf my mechanical engineer:
Our total breakdown of energy use is as follows:
IAQ testing in a new addition
NC-2009 IEQc3.2:Construction IAQ management plan - before occupancyposted by Shawn Keith on
We have chosen to perform IAQ testing on a new additon we are building onto an existing building.
IAQ testing in a new addition
NC-2009 IEQc3.2:Construction IAQ management plan - before occupancyposted by Shawn Keith on
We are have chosen to perform IAQ testing on a new additon, to a we are building.
Maintenance Garage Baseline System
NC-2009 EAp2:Minimum energy performanceposted by Keith Lane on
I'm hoping someone can help me determine the appropriate Baseline system for a Vehicle Maintenance Facility for a LEED v2009 project. The total project area is about 34,500 s.f.
Information on 10 years canopy
CS-v4 SSc5:Heat island reductionposted by Marianne Vajstedt on
Do you know where information can be found to determine the daimeter of trees after 10 years of planting? Our landscaping architect have only the information in maturity.