Forum quick links
Partitioning off section of offsite parking structure
NC-v4 LTc7:Reduced parking footprintposted by Chad Thurlow on
Hello
Bikes & Showers for Multiple Buildings
CS-v4 LTc6:Bicycle facilitiesposted by Sanyog Rathod on
We have three Core & Shell Buildings on one site. They are pursuing seperate certifications, and because of the small size of the projects, we are not doing a campus or group certification.
Option 2 Budget Calculation - Mechancial Adhesives and Sealants
CI-v4 EQc2:Low emitting materialsposted by Gina Rahmann on
If pursuing the budget calculation method, how do you capture the layer surface area for mechanical products such as duct sealants, pipe sealants, firestop, etc.
Do Recycling Rooms need to be Negatively Pressurized?
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Nicole Pandolfo on
Do recycling rooms need to be negatively pressurized to meet the requirements of Interior Cross-Contamination Prevention in LEED V4 now that recylcing rooms must include the collection of batteries
Issues & Benefits Log - seeking clarification
NC-v4 EAp1:Fundamental commissioning and verificationposted by Joyce Kelly on
Trying to figure out how the Benefits side of this Log might work.
Drywall replaced on int. non-structural wall
NC-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elementsposted by Marisa Britton on
If a non-structural wall is to have the studs remain but the drywall replaced, will that area still qualify for the MRc1.2 calculation?
Flooring & "categories"
NC-v4 EQc2:Low emitting materialsposted by Erin Holdenried on
Does the flooring category for Option 1 Threshold path include the same materials as LEED v2009 did? All flooring adhesives, coatings, sealers, grout, etc.? In Table 5 of the refer
Flooring & "categories"
NC-v4 EQc2:Low emitting materialsposted by Erin Holdenried on
Does the flooring category for Option 1 Threshold path include the same materials as LEED v2009 did? All flooring adhesives, coatings, sealers, grout, etc.? In Table 5 of the refer
Basement renovation to a LEED Platinum Building
posted by Faith Wilbert on
How do you go about a renovation in a LEED Plaitnum building? Do you have to do a recertification or another process. Theay are renovating 1 floor and I'm not sure the approach I need to take