Forum quick links
Where do you find the "Mitigated Design Storm Rainfall Volume" for the entire site (cu ft)?
EBOM-2009 SSc6:Stormwater quantity controlposted by bryan lauer on
For Miami-Dade County, FL.
In the SSc6 form, where do I find the "Mitigated design rainfall volume for the entire site (cu ft)? In the building
1/4 mile radius cuts through building...
NC-v4 LTc4:Surrounding density and diverse usesposted by Alara Brinton on
The edge of my 1/4 mile radius cuts half way through a couple buildings...would I include half the area in my density calculations, whole, or not include the building at all?
O+M Starter Kit for CI
CI-v4 INc1:Innovationposted by Kristen Magnuson on
Our CI project Owner is occupying 100% of the building, including core space. They are also responsible for operations and maintenance practices. However, they are do not own the building.
Service Sink Baseline flow
NC-2009 WEp1:Water use reductionposted by Jorge Torres-Coto on
I have a project that includes mainly Vocational Classrooms. As such, each classroom has Service Sink for washing hands after each class (Diesel, Auto Mechanic, Carpentry, Welding, Sheet Meta
Retail -Clarifying Reference Guide language indicating "14 days"
Retail-CI-v4 EQc4:Indoor air quality assessmentposted by Stacey Olson on
The LEED reference guide indicates "Retail projects may conduct the testing within 14 days of occupancy." I read this to mean that air sampling can occur up to 14 days post occupancy.
Roller Window Shades
NC-v4 EQc2:Low-emitting materialsposted by Christine Chow on
Are interior installed roller window shades included in the credit requirements?
Overhead coiling doors
Schools-2009 IEQc8.2:Daylight and views - viewsposted by Danielle Dunn on
Can overhead coiling doors count in this credit? Also if you have windows on more than one plane in a room should you take a section at each plane or show those windows in "elevation"?
Innovation Credits in v4
NC-v4 INc1:Innovationposted by Lissa Spitz on
Hi all, I see that several of the old faithful innovation credits are still available in v4, but when I search actual v4 certified projects, I can't find a single one shown on their scorecards.&nbs
Treatment of Garages in calculating CWM Baselines
Homes-v4 MRc3:Construction waste managementposted by Kimberly Vermeer on
Small addition to existing building
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Edmée Knight on
Our project is a small addition (<10% of total building GSF) to an existing building.