LEED Deliverables from EnergyPro - Purchased Campus Utilities

NC-2009 EAp2:Minimum Energy Performance
posted by  Evan Friesen  on 

Hello, I am working on a project in Davis. The building utilizes campus (district) steam for heating and chilled water for cooling.

0

Inclusion of total building in density calculation

CI-v4 LTc2:Surrounding density and diverse uses
posted by  Deborah Stadler  on 

What happens when the 1/4 mile from the project boundary bisects a dense building?  Can the whole building be included in the calculation?  Only the part of the building that is in the 1/

1
Wed Dec 20, 2017, 12:11 am

Building Add-on to Design-Build Parking Structure

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  GBD Architects  on 

We are pursuing an office project that would be essentially an addition to a parking structure that is being built design-build just several months in advance of when our work would take place.

1
Thu Jan 4, 2018, 5:13 pm

Where do you find the "Mitigated Design Storm Rainfall Volume" for the entire site (cu ft)?

EBOM-2009 SSc6:Stormwater Quantity Control
posted by  bryan lauer  on 

For Miami-Dade County, FL.

In the SSc6 form, where do I find the "Mitigated design rainfall volume for the entire site (cu ft)?  In the building 

1
Mon Jan 15, 2018, 11:05 pm

1/4 mile radius cuts through building...

NC-v4 LTc4:Surrounding density and diverse uses
posted by  Alara Brinton  on 

The edge of my 1/4 mile radius cuts half way through a couple buildings...would I include half the area in my density calculations, whole, or not include the building at all? 

4
Sun Dec 17, 2017, 9:57 pm

O+M Starter Kit for CI

CI-v4 INc1:Innovation
posted by  Kristen Magnuson  on 

Our CI project Owner is occupying 100% of the building, including core space. They are also responsible for operations and maintenance practices. However, they are do not own the building.

1
Thu Dec 14, 2017, 10:59 pm

Service Sink Baseline flow

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Jorge Torres-Coto  on 

I have a project that includes mainly Vocational Classrooms.  As such, each classroom has Service Sink for washing hands after each class (Diesel, Auto Mechanic, Carpentry, Welding, Sheet Meta

0

Retail -Clarifying Reference Guide language indicating "14 days"

Retail-CI-v4 EQc4:Indoor air quality assessment
posted by  Stacey Olson  on 

The LEED reference guide indicates "Retail projects may conduct the testing within 14 days of occupancy." I read this to mean that air sampling can occur up to 14 days post occupancy.

0

Roller Window Shades

NC-v4 EQc2:Low emitting materials
posted by  Christine Chow  on 

Are interior installed roller window shades included in the credit requirements?

1
Wed Dec 13, 2017, 8:15 pm

Overhead coiling doors

Schools-2009 IEQc8.2:Daylight and Views—Views
posted by  Danielle Dunn  on 

Can overhead coiling doors count in this credit? Also if you have windows on more than one plane in a room should you take a section at each plane or show those windows in "elevation"?

1
Wed Dec 13, 2017, 3:54 pm