LEED Deliverables from EnergyPro - Purchased Campus Utilities
NC-2009 EAp2:Minimum Energy Performanceposted by Evan Friesen on
Hello, I am working on a project in Davis. The building utilizes campus (district) steam for heating and chilled water for cooling.
Inclusion of total building in density calculation
CI-v4 LTc2:Surrounding density and diverse usesposted by Deborah Stadler on
What happens when the 1/4 mile from the project boundary bisects a dense building? Can the whole building be included in the calculation? Only the part of the building that is in the 1/
Building Add-on to Design-Build Parking Structure
NC-v4 MPR2:Must use reasonable LEED boundariesposted by GBD Architects on
We are pursuing an office project that would be essentially an addition to a parking structure that is being built design-build just several months in advance of when our work would take place.
Where do you find the "Mitigated Design Storm Rainfall Volume" for the entire site (cu ft)?
EBOM-2009 SSc6:Stormwater Quantity Controlposted by bryan lauer on
For Miami-Dade County, FL.
In the SSc6 form, where do I find the "Mitigated design rainfall volume for the entire site (cu ft)? In the building
1/4 mile radius cuts through building...
NC-v4 LTc4:Surrounding density and diverse usesposted by Alara Brinton on
The edge of my 1/4 mile radius cuts half way through a couple buildings...would I include half the area in my density calculations, whole, or not include the building at all?
O+M Starter Kit for CI
CI-v4 INc1:Innovationposted by Kristen Magnuson on
Our CI project Owner is occupying 100% of the building, including core space. They are also responsible for operations and maintenance practices. However, they are do not own the building.
Service Sink Baseline flow
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Jorge Torres-Coto on
I have a project that includes mainly Vocational Classrooms. As such, each classroom has Service Sink for washing hands after each class (Diesel, Auto Mechanic, Carpentry, Welding, Sheet Meta
Retail -Clarifying Reference Guide language indicating "14 days"
Retail-CI-v4 EQc4:Indoor air quality assessmentposted by Stacey Olson on
The LEED reference guide indicates "Retail projects may conduct the testing within 14 days of occupancy." I read this to mean that air sampling can occur up to 14 days post occupancy.
Roller Window Shades
NC-v4 EQc2:Low emitting materialsposted by Christine Chow on
Are interior installed roller window shades included in the credit requirements?
Overhead coiling doors
Schools-2009 IEQc8.2:Daylight and Views—Viewsposted by Danielle Dunn on
Can overhead coiling doors count in this credit? Also if you have windows on more than one plane in a room should you take a section at each plane or show those windows in "elevation"?