Ventilation rates at unoccupied rooms
CI-2009 IEQp1:Minimum IAQ Performanceposted by Stacey Olson on
This project is in California, and ventilation rates comply with Title 24.
NPDc8 - Option 2 / Define "Occupants"
ND-v2009 NPDc8:Transportation demand managementposted by Stacey Olson on
This option indicates transit passes must be provided to project "occupants". Are "Occupants" FTE, residents, or inclusive of 100% of people who come to the site?
Shop-applied primer/touch-up paint for field
NC-v4 EQc2:Low emitting materialsposted by Shaunna Shaw on
I work for a structural steel contractor working on our first LEED v4 project and we are having difficulty getting our standard shop primer approved by the GC. The paint does not meet th
Renewable fuels and "green" natural gas?
CS-v4 EAc7:Green power and carbon offsetsposted by Adolfo Silva on
Is it possible to account for externally-produced renewable fuels in the "total energy use" calculation?
Office, conference room to Hallway, stairs STCc Interpretation
CI-v4 EQc9:Acoustic performanceposted by Jeffrey Fullerton on
In this credit, there is a requirement for an STCc 50 rating for "Office, conference room" to "Hallway, stairs".
BE CxA - Rules and Regulations? Who can do it?
Retail-NC-v4 EAc1:Enhanced commissioningposted by Brian Salazar on
Do the same restrictive rules apply to the Building Envelope CxA as they do to the MEP CxA? I don't see any detail about this on the USGBC site.
Preserve and protect from all development and construction activity 40% of the greenfield area on the site
NC-v4 SSc2:Site development - protect or restore habitatposted by Jason Garvens on
I'm hoping someone can make this requirement interpretation crystal clear for me as I'm struggling to fully grasp what it mean.
Modeling Mechanical Systems for Core Areas
CS-v4 EAp2:Minimum energy performanceposted by Chris Hammett on
I am working on a project that includes some limited core areas such as lobby, electrical rooms, restrooms, etc. and spaces allocated for future tenants.
Recharging Stations - Off-site parking
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Jay Murray on
This project is a new 33 story hotel/condo in Boston. There is no parking garage in the building.
RE: Not Venting Copy Rooms Because of ASHRAE Interpretation IC 62.1-2007-25
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Joe Manganelli on
Hey All,