MRc2 Construction Waste Management

CI-2009 MRc2:Construction Waste Management
posted by  Michael Roth  on 

I have comingled waste and diverted metals.  One recycler sorts CMU, wood, paper/cardboard and metal off-site and records are kept in CYDs.  The other two recycle centers do Ferrous metal

4
Thu Feb 8, 2018, 9:55 pm

Not sure what we can do with this credit

EBOM-v4 SSc6:Site improvement plan
posted by  Meier Corporate Account  on 

Our facility was constructed in the center of 96 acres of asphalt. The area had been asphalt for well over 20 years before this.

2
Founder & Senior Consultant
Viable LLC
LEEDuser Premium Member
12 thumbs up
Wed Feb 7, 2018, 4:21 pm

Addenda item from 1/5/2018 - Required Documentation table

NC-v4 EAc5:Renewable energy production
posted by  Erica Downs  on 

Hello - I was reviewing the Reference Guide addenda items, and there is one for this credit that just does not make sense.  It is regarding the Required Documentation table, page 439 in the RG

1
Fri Feb 9, 2018, 6:17 pm

Option 1 & 2

NC-v4 EQc6:Interior lighting
posted by  Christine Chow  on 

Are existing light fixtures required to be included in the calculations for both options?

1
Thu Feb 15, 2018, 5:53 pm

The correct/latest 62MZ & LEED min. IAQ spreadsheet?

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Aru Sau  on 

Is "v2009v4_Minimum IAQ Performance Calculator_v03" spreadsheet is the correct/right one for a project registered in February 2016 in LEED 2009? Also, Is there any updated "62MZCalc.xls" (Revised A

11
Mon Feb 5, 2018, 7:18 pm

Controllability in Gallery/Exhibition spaces

NC-v4 EQc6:Interior lighting
posted by  Elizabeth Powers  on 

Does anyone have experience or insight into achieving this credit in gallery or exhibition spaces?

3
Mon Feb 5, 2018, 5:06 am

Residence Hall 24 hour Use Spaces

NC-2009 SSc8:Light Pollution Reduction
posted by  Lisa Ferreira   on 

We have designed a residence hall that has single and double rooms on a double loaded corridor, with shared floor lounges and studies.

2
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Sat Feb 3, 2018, 4:32 pm

Preferred Parking Enforcement Requirements.

NC-v4 LTc8:Green vehicles
posted by  Chris Brown  on 

Regarding the preferred parking, the credit requrements state "Clearly identify and enforce for sole use by green vehicles." (emphasis added).

2
Chief Engineer
Lile Engineering, LLC
LEEDuser Basic Member
59 thumbs up
Fri Feb 2, 2018, 7:54 pm

Grid interactive charging stations

NC-v4 LTc8:Green vehicles
posted by  Lawrence Lile  on 
  • USGBC requires that electrical connectors must adhere to SAE Surface Vehicle Recommended Practice J1772, SAE Electric Vehicle Conductive Charge Coupler or an equivalent regional or local sta
3
Chief Engineer
Lile Engineering, LLC
LEEDuser Basic Member
59 thumbs up
Fri Feb 2, 2018, 6:43 pm