Forum quick links
Including Locker Rooms in IEQp1 Calculations
Schools-NC-v4 EQp1:Minimum indoor air quality performanceposted by Elizabeth Galloway on
We are currently working on completing the design documentation for a large high school pursuing LEED v4.
Lactation Room WEp1 Sink Calcs
NC-2009 WEp1:Water use reductionposted by Rob Hink on
We have a NC project that has a lactation room with a sink in the room of a cruise terminal. There will be 345 FTEs and 7,000+ Visitors on a daily basis.
WEc1 Thresholds Tab
NC-2009 WEc1:Water efficient landscapingposted by H M on
Within the WEc1 "Thresholds" tab, there is a green button that reads "Submit". Are you supposed to click this button in order for the credit to be ready for review?
IEQ Space Matrix?
NC-v4 EQp1:Minimum indoor air quality performanceposted by Erica Downs on
Is the IEQ Space Matrix still relevant for this Prereq under v4?
Historical Exemptions from Requirements
Pilot-Credits PC14:Walkable Streetsposted by Qiongwen Kong on
Has anyone had any experience with an exemption to a requirement due to a historical building or feature? This is regarding the requirement that no more than 30% of the primary façade can be witho
"CHECK FORM" doesn't work at the bottom of template IEQc5
NC-2009 IEQc5:Indoor chemical and pollutant source controlposted by H M on
I am unable to "CHECK FORM" at the bottom of my template IEQc5 in LEED online. The text "Incomplete.
Dwelling Unit Ventilation
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Boggarm Setty on
Hi, we are working on a residential building and filling out "Minimum IAQ performance" ventilation calculator.
Report multiple electric meters on Energy Star Portfolio Manager
NC-2009 PIf1:Minimum Program Requirementsposted by Edward Gulick on
I am (finally) wrapping up documentation on a multi-tenant building. It is a LEED-NC project because over 50% of the leaseable space is owner-occupied. The building has 4 electric
Insulated Metal Panel
NC-v4 EQc2:Low-emitting materialsposted by Erin Holdenried on
Any thoughts how an insulated metal panel would (or would not be included) in the credit for the Option 1 path? I assume is would not need to be included as it is a factory-finished metal pro
Previous Owner to Demolish Building Prior to Our New Owner Taking Control
NC-v4 MRp2:Construction and demolition waste management planningposted by Steven Blais on
Our client is negotiating to lease or acquire property to construct new facilities.