Heat Island Reduction - Question regarding what qualifies for a "vegetated roof"
NC-v4 SSc5:Heat island reductionposted by Philip Hamp on
Can an underground building, with an insulated roof and 24inches of fill and turf on top, qualify for a vegetated roof in NC-v4, SSc5?
Does gravel count in "Total Paving Area"
NC-v4 SSc5:Heat island reductionposted by Emily Larochelle on
Hi,
I have seen a couple posts about how to count gravel in a nonroof measure. However, I am wondering if gravel counts in the "Total site paving area" of the calculation.
UL Greenguard Gold
EBOM-v4.1 EQc1:Green Cleaningposted by Summer Minchew on
Do products that have UL Greenguard Gold certification meet the requirements for Products & Materials?
Plug Load Exemption
NC-2009 EAp2:Minimum energy performanceposted by Kim Lombard on
Has anyone ever gotten or heard about a plug load exemption for projects that demonstrate energy savings but due to extreme plug loads (over 60%) cannot meet the prerequisite 10%?
EApc159 - Green Leases ACP
posted by Sustainability & Commissioning on
Hi all,
The point allocation for EApc159 - Green Leases ACP refers to the Green Lease Leaders Recognition (Silver, Gold, Platinum). What does that exactly mean?
Thank you,
Recycled content for different concrete mixes
NC-v4.1 MRc3:Sourcing of Raw Materialsposted by Saif Ahmed Mohammed on
Hi all,
Calculator Protected sheet v4 1_Bldg products calculator_v04
NC-v4.1 MRc2:Environmental Product Declarationsposted by Allison Para on
Hello LEED Experts,
Please help me with the v4.1 Calculator for (MR) Building products calculator. I am unable to make any changes or edits.
Sub-Metering for small service buildings
NC-v4 EAc3:Advanced energy meteringposted by Cyle Sheppard on
I have a question from our Electrical Engineer that I am unsure on.
Option 2 (prescriptive path) documentation?
NC-v4 EAp2:Minimum energy performanceposted by Erica Downs on
I have a project attempting EAp2/c2 via the prescriptive pathway, Option 2, 50% AEDG. The only "required documentation" listed in the Reference Guide is the completed AEDG tables, which seems
LEED MR Credits and Division 13
posted by Ralph Bicknese on
We are working on a LEED B+C (non healthcare) project that has a clean room and trying to determine whether or not the clean room "unit"/prefab wall panel systems and ceiling panel systems should b