Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Efficient Refrigeration Equipment

CI-v4 EAc2:Optimize energy performance
posted by  Michael Archer  on 

Under 'Further explanation - Exceptional Calculation method - Changes from earlier versions of ASHRAE and LEED', the CI reference guide states "All project types may count energy savings from effic

5
Default Avatar
Principal Engineer
HSA Engineering
LEEDuser Premium Member
5 thumbs up
Tue May 22, 2018, 4:32 pm

How to fill out the Credit form for IEQc1 for a 100% outdoor air system that does not require OA monitoring?

NC-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Nishank Shah  on 

I have a 100% OA ERU that operates constantly on an occupancy schedule. There is no Outdoor airflow monitoring device on the unit and no CO2 sensors for the densely occupied spaces.

4
Tue May 22, 2018, 3:14 pm

How to fill out the Credit form for IEQc5 for a 100% outdoor air system that does not require OA monitoring?

NC-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Nishank Shah  on 

I have a 100% OA ERU that operates constantly on an occupancy schedule. There is no Outdoor airflow monitoring device on the unit and no CO2 sensors for the densely occupied spaces.

0

General Emissions Evaluation for installation products

Schools-EBOM-v4 EQc1:Indoor air quality management program
posted by  Sara Axon  on 

For installation of millwork, our installer uses basic items:  liquid nail, wood glue, silicone, spackle, etc.

0

Averaging Thermostats - acceptable means for 50%?

NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfort
posted by  Mark Van  on 

I am working on a Healthcare building, and most of the spaces combine (3) rooms into a single temperature control zone, with the thermostat located in one of the rooms.  Would adding (at least

1
Sun Jan 6, 2019, 11:48 am

Locker Rooms as Changing facilities

NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Ryan Christensen  on 

As I fill out the SSc4.2 credit form, I am having trouble reconciling my project into the changing facility vs. shower categories. The project has two large locker rooms with 100+ lockers.

3
LEED AP ID+C & BD+C
Ecoteric Ltd
LEEDuser Premium Member
1 thumbs up
Thu May 17, 2018, 6:33 pm
2
CEO
Green Commons, LLC
LEEDuser Expert
586 thumbs up
Thu May 17, 2018, 5:35 pm

Dual Flush Flow Rate

NC-v4 WEp2:Indoor water use reduction
posted by  Leanne Conrad  on 

We have a product data sheet for a dual flush toilet that states 6L/3L with an effective flush volume of 4L.

3
Sustainability Director, Certifications & Compliance
Jacobs
LEEDuser Expert
469 thumbs up
Thu May 17, 2018, 1:54 am