Clarification Needed on Reporting Bus Trips

NC-v4.1 LTc5:Access to Quality Transit
posted by     on 

I’m seeking clarification on a matter related to daily trip reporting for our local transit system. We have multiple buses running simultaneously on certain routes.

2
Sustainable Design Lead
CannonDesign
LEEDuser Expert
379 thumbs up
Wed Sep 18, 2024, 6:50 am

5 year replacement period?

CI-v4 EAp3:Fundamental refrigerant management
posted by  Laura Charlier  on 

"For existing buildings with existing equipment or projects that use existing central plants, teams will need to check if CFC-based refrigerants are being used.

0

Pilot vs ACP?

Pilot-Credits EApc95:Alternative Energy Performance Metric
posted by     on 

We have a project pursuing the EApc95 as part of its effort to monitor its carbon footprint.

1
Tue Apr 8, 2025, 12:34 pm

Extended Producer Responsibility program

NC-v4.1 MRc3:Sourcing of Raw Materials
posted by  Tracy Marquis  on 

I am hoping to start a list of manufacturers with Extended Producer Responsibility Programs (EPRs) that meet the LEED V4.1 criteria.  

2
Sustainability Engineer
Consigli Construction
LEEDuser Premium Member
0 thumbs up
Fri Sep 13, 2024, 5:45 am

Maps from the Stone Age Don't Exist?

NC-v4 SSc4:Rainwater management
posted by  Hannah Fleck  on 

I am trying to track down historical information to meet the compliance for the pre-development pathway but am coming up short for finding land cover and contour maps predevelopment.

1
Sat Sep 14, 2024, 9:59 am

Energy modeling for Half a Floor

CI-v4 EAp2:Minimum energy performance
posted by  Edgar Arevalo  on 

So we are facing a new Commercial Interior project that only takes up approximately half of a floor.  The problem we are facing is if we can conduct an energy model for half of floor.  Th

3
Energy Engineer
ads ENGINEERS, DPC
LEEDuser Basic Member
21 thumbs up
Thu Sep 12, 2024, 7:32 pm

Enhanced Commissioning - Envelope Commissioning

NC-v4 EAc1:Enhanced commissioning
posted by  Todd Bundren  on 

I am working on a new Cancer Center in St. Louis, MO. We are pursuing the envelope commissioning credits and have a question regarding the requirements:

1
Sat Sep 7, 2024, 6:42 pm

Mechanical Equipment

NC-v4.1 MRc2:Environmental Product Declarations
posted by  Summer Gorder  on 

Can you include mechanical equipment in the BPDO credits?

5
Thu Sep 5, 2024, 10:15 pm