Enhanced IAQ - EP for 2 strategies under Option 2?

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  Teresa Stern  on 

We are looking at installing CO2 monitoring at densely occupied spaces. We are also providing a dust collection system monitor and audible alarm at the firing range in a police station.

1
Tue Jan 15, 2019, 11:13 pm

Passing FSC credit to the End User

NC-2009 MRc7:Certified Wood
posted by  Bobby White  on 

Our company is working to obtain FSC certification. This is new to us so I'm trying to figure how to pass along the credit percentage.

2
Policy and Standards Manager - Chain of Custody
Forest Stewardship Council US
LEEDuser Expert
14 thumbs up
Tue Jan 15, 2019, 9:54 pm

Using Trane Trace for Solar PV Modeling

NC-2009 EAp2:Minimum Energy Performance
posted by  Bo White  on 

Our building will have on-site (and dedicated campus) solar PV, and we're using Trane's Trace program for our ASHRAE 90.1 energy model.

3
Senior Project Engineer
NegaWatt Consulting
LEEDuser Basic Member
5 thumbs up
Mon Jan 14, 2019, 7:30 pm

Waste audit(s) schedule when recertifying a LEED EBOM project

EBOM-2009 MRc6:Solid Waste Management—Waste Stream Audit
posted by  Vanessa Seibert  on 

My client's building obtained the MRc6 (Waste Stream Audit) credit four years ago with our LEED EBOM v2009 certification. We did not receive MRc7 (Waste Mgmt of Ongoing Consumables).

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Sun Jan 13, 2019, 11:02 pm

Existing Building as LCA Baseline

NC-v4 MRc1:Building life-cycle impact reduction
posted by  Kristen DiStefano  on 

One of the four options for creating LCA baselines according to this LEED Interpretation - https://www.usgbc.org/content/100002019 - is to use an existing building, and make modifications necessary

4
Default Avatar
President
Athena Sustainable Materials Institute
LEEDuser Basic Member
6 thumbs up
Fri Jan 11, 2019, 10:14 pm

PI Form 2 Estimated project budget

NC-2009 PIf2:Project Summary Details
posted by  Brian Durgin  on 

Our project consist of multiple buildings on a large site, well our LEED Boundary only includes the main building and surrounding site area.

1
Fri Jan 11, 2019, 6:33 pm

Biorenewable paint

LEED v4.1 Discussion Forum
posted by  Eric Linak  on 

Are there plans to give high credits to paints or adhesives that contain biorenewable content?

1
Wed Jan 30, 2019, 3:20 pm

Clarify the requirement for offsite coatings (and/or coating that will be covered)

NC-v4 EQc2:Low emitting materials
posted by  Summer Gorder  on 

The team as me to clarify the definition of Primers, Sealers, and Undercoaters in the LEED description?  Does that include any coating that gets covered with an addi

1
Thu Jan 10, 2019, 9:30 pm

Project Boundary - Excluding ceiling work for HVAC and plumbing connections

CI-v4 MPR2:Must use reasonable LEED boundaries
posted by  Tracy Marquis  on 

We are renovating spaces on the ground floor of an academic building.  The primary renovation spaces are contiguous, however, there will be minor work in the ceilings, outside of the LEED boun

2
Founder & Community Director
Metricorps
LEEDuser Expert
7781 thumbs up
Wed Jan 9, 2019, 4:46 pm
2