Forum quick links
Case 2 Option 2C
EBOM-2009 EAc1:Optimize Energy Performanceposted by Patrick Cellie on
I am working with a convention center that is currently Silver certified under the v2009 EBOM rating system.
How to calculate multi-level Decks / Patios
NC-v4 SSc5:Heat island reductionposted by Sara Hickman on
The project will have several patios / decks throughout, many of which will be covered by a large cantilever above (being the building itself).
Construction and Demolition Waste Management Plan – Sample
CI-v4 MRc6:Construction and demolition waste managementposted by milo valenti on
Construction and Demolition Waste Management Plan – Sample Are there template sample form in Excel format for our recycling yard?
Schools - 2009 IEQp3 - STC requirement between Computer Lab and Elevator Shaft
Schools-2009 IEQp3:Minimum Acoustical Performanceposted by Todd Bundren on
Does anyone know what the STC requirement is for a partition that separates a computer lab and an elevator shaft?
Intermittent ventilation
NC-v4 EQp1:Minimum indoor air quality performanceposted by Dustin Smith on
Has anyone successfully used scheduled intermittent ventilation for a constant-volume exhausted space to avoid overventilation, and to minimize energy usage, in a warehouse or similar space?
waste generated from new construction
Mid-Rise-v4 MRc3:Construction waste managementposted by sue bryant on
If you are removing an existing building, can the waste from the building be counted if you are recycling it?
On-site or off-site separation
Homes-v4 MRc3:Construction waste managementposted by Amrit Kaur on
The credit general requirement requires a percentage of material recycled, and a formal report indicating how much was recycled and to what purpose.
Option 2 - Excluding Demo
NC-v4 MRc5:Construction and demolition waste managementposted by Nathan Gauthier on
The credit language says "do not generate more than 2.5 pounds of construction waste..." but the example Equation 2 shows "Total construction AND DEMOLITION waste generated..." Has anybody clarifie
Option 2 - Based on GSF, excluding garage area but including garage CDW?
NC-v4 MRc5:Construction and demolition waste managementposted by Michelle Bombeck on
It appears that the for Option 2, teams must calculate the total waste generated for the project which might include construction of a garage or other site feature that would not be included in the