Forum quick links
Glare-control devices - glazed doors?
CI-v4 EQc7:Daylightposted by Victoria Watson on
Hi - When the user guide says "provide glare-control devices for all transparent glazing" does it really mean all? I am assuming it doesn't mean high volume doors with transparent gl
Separation of space requirements if stove is separately vented
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Ann Kelly on
All,
If we have an electric residential grade stove, which is separately vented, located in an open break room setting, will this satisfy the requirements for separation of space?
rating system for a manufacturing facility?
posted by Gail Napell on
Hi all
we're looking to accredit a manufacturing facility with about 85% mfg/ warehouse and 15% offices/ amenity space. Which rating system is the most applicable?
Updated Modeling Manual?
CI-v4 EAp2:Minimum energy performanceposted by Deborah Stadler on
USGBC has the Advanced Energy Modeling for LEED Technical Manual v2.0 for LEEDv2009, which was helpful. We cannot find an updated version for v4. Does anyone know if this exists and whe
Master Site with three projects possibly a fourth
posted by Lou Niles II on
Hello I am looking for guidance or experience in a phased construction on a Master Site. I have a Master Site in southern California has three Core & Shell projects on it.
Baseline System Selection
NC-v4 EAp2:Minimum energy performanceposted by John on
I am working on a LEED for Homes project. The project has AHU units, Heat pumps and DOAS. All dwelling units has HPs.
Laminating and Contact Adhesives - Shop Applied - in v4
NC-v4 EQc2:Low emitting materialsposted by Landry Watson on
I've scrolled, searched and reviewed the comments here on the thread and I'm still not clear on whether Laminating/Contact adhesives used for bonding laminates to substrates for shop assembled mill
Legal Wood - Pilot Credit LEEDv4
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Sophie Kerr on
If I have SFI products that make up 100% of my wood products, 25+% of my total materials, and have I completed the survey, have I met the pilot credit?
Baseline Example
Pilot-Credits IPpc93:Prevention through Designposted by Logan McNeil on
Our project (UCSF Block 33, SF CA) has found this credit to be worthwhile to pursue, as safety should live in every aspect of a construction project. However, the team noted that it would hav