Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Glare-control devices - glazed doors?

CI-v4 EQc7:Daylight
posted by  Victoria Watson  on 

Hi - When the user guide says "provide glare-control devices for all transparent glazing" does it really mean all? I am assuming it doesn't mean high volume doors with transparent gl

2
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Thu Mar 28, 2019, 10:00 pm

Separation of space requirements if stove is separately vented

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  Ann Kelly  on 

All,

If we have an electric residential grade stove, which is separately vented, located in an open break room setting, will this satisfy the requirements for separation of space?

0

rating system for a manufacturing facility?

LEED Rating System Selection
posted by  Gail Napell  on 

Hi all

we're looking to accredit a manufacturing facility with about 85% mfg/ warehouse and  15% offices/ amenity space.  Which rating system is the most applicable?

2
Wed Mar 27, 2019, 5:10 pm

Updated Modeling Manual?

CI-v4 EAp2:Minimum energy performance
posted by  Deborah Stadler  on 

USGBC has the Advanced Energy Modeling for LEED Technical Manual v2.0 for LEEDv2009, which was helpful.  We cannot find an updated version for v4.  Does anyone know if this exists and whe

1
Wed Mar 27, 2019, 5:01 pm

Master Site with three projects possibly a fourth

LEED Guidance for Campuses and Multiple Buildings
posted by  Lou Niles II  on 

Hello I am looking for guidance or experience in a phased construction on a Master Site. I have a Master Site in southern California has three Core & Shell projects on it.

1
Fri May 31, 2019, 11:32 am

Baseline System Selection

NC-v4 EAp2:Minimum energy performance
posted by  John   on 

I am working on a LEED for Homes project. The project has AHU units, Heat pumps and DOAS. All dwelling units has HPs.

3
Default Avatar
LEEDuser Basic Member
0 thumbs up
Wed Mar 27, 2019, 12:54 pm

Laminating and Contact Adhesives - Shop Applied - in v4

NC-v4 EQc2:Low emitting materials
posted by  Landry Watson  on 

I've scrolled, searched and reviewed the comments here on the thread and I'm still not clear on whether Laminating/Contact adhesives used for bonding laminates to substrates for shop assembled mill

10
Tue Mar 26, 2019, 12:55 am

Legal Wood - Pilot Credit LEEDv4

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Sophie Kerr  on 

If I have SFI products that make up 100% of my wood products, 25+% of my total materials, and have I completed the survey, have I met the pilot credit?

7
Default Avatar
President
Solterre Inc.
LEEDuser Premium Member
47 thumbs up
Tue Mar 26, 2019, 12:06 am

Baseline Example

Pilot-Credits IPpc93:Prevention through Design
posted by  Logan McNeil  on 

Our project (UCSF Block 33, SF CA) has found this credit to be worthwhile to pursue, as safety should live in every aspect of a construction project.  However, the team noted that it would hav

1
Mon Jan 15, 2024, 8:41 am