Forum quick links
Definition of Inpatient Units
Healthcare-v4 MRc8:Design for flexibilityposted by Neumann Monson on
Our project is a Behavioral Health Community Access Center. We're considering using the Horizontal Expansion option under design for flexibility.
Building-level energy metering
NC-v4 EAp3:Building-level energy meteringposted by Tim Hemsath on
How does USGBC enforce the commitment to sharing with USGBC the resulting energy consumption data and electrical demand data (if metered)...
v4_Low Emitting Materials Calculator
CI-v4 MRc5:Building product disclosure and optimization - material ingredientsposted by Thomas Bennett on
I am trying to fill out this LEED calculator for the 5 HVAC materials that we are using on a project, 440 Gasket Tape, Duct Sealant DP1015, Oatey No 5.
Mandatory Requirements and Applicable Exceptions: Section 8.1.5
CI-v4 EAp2:Minimum energy performanceposted by Waleed AlGhamdi on
In a LEED v4 CI project, we have a floor that will architecturally stay the same. New HVAC and new lighting fixtures (same ceiling and placement though).
Interior Reuse - shared walls with other businesses
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Lou Niles II on
Hello Can anyone give some advice on including Both sides or one side of interior walls for a Tenant Improvement where the other side of the wall is a space not in the scope.
Modeling Electric Heaters
NC-2009 EAp2:Minimum Energy Performanceposted by Fatou Jabbie, | Technology | Design and Engineering Plan Reviews | Energy Code Compliance | Sustainability | LEED AP BD+C on
Hi,
MRc6 & MRc7
NC-2009 MRc6:Rapidly Renewable Materialsposted by Richard Metts on
Our team has asked the question if both MRc6 and MRc7 can both be entered together for credits. The project has FSC certified wood throughout the project and for MRc6 the FSC Certified Wood m
Does anyone know if exemplary performance points are still available in V4.1
NC-v4.1 MRc2:Environmental Product Declarationsposted by James Howarth on
Our project is currently registered in V4 and considering opting in to V4.1 for the Building Product Disclosure and Optimization - Environmental Product Declarations credit.
How does the USGBC evaluate EPD expiration dates for projects with long construction periods.
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by James Howarth on
Hello,
SRI for 3+yr-old GRAVEL
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by rebecca costanzo on
Does anyone have a chart with SRI ranges for gravel 3+ years aged. Trying to get a ballpark number to see if it's worth testing or getting new white gravel for the client for LEED4 submission.