Appeal for denied credit
posted by Johnathan Woodside on
If a project has been submitted for review (Design prelim and Construction prelim) comments are received for each review.
Adding Green Energy points after final construction review
posted by Susan Di Giulio on
So we have a difficult v2009 project that strained to achieve simple certification. It came back from prelim construction review with only one comment.
Adding PV to a project AFTER Energy efficiency prelim has been accepted in Design Review
posted by Susan Di Giulio on
Hi,
exceptions for farmland?
NC-v4 LTc2:Sensitive land protectionposted by Erica Downs on
We have an infill site on a university campus. Unfortunately, this particular plot of land was previously undeveloped. When checking the soils survey site, a portion of the site comes u
APPA Room Type Definitions
EBOM-2009 IEQc3.2:Green Cleaning—Custodial Effectiveness Assessmentposted by Alexis Doyle on
Hello,
ROI for LEED at Healthcare Campus
posted by Barbara Hamilton on
Please share any reports or data that exemplifies the ROI of building and operating a LEED building, specifically for healthcare, i.e. Acute Care Hospital and Out Patient Pavillion.
SSpc41 Walkable Project Site
NC-v4 INc1:Innovationposted by Helene Lefkowitz on
Our project team pursued this pilot credit and found it to be very achievable for projects in urban settings.
Exemplary Threshold
NC-v4 LTc5:Access to quality transitposted by Jane Bills on
I have a Core & Shell project with the following:
RAIL:
249 Weekday 117 Weekend
BUS:
LEED v4 CI EAb Opt. Energy Perf. : Option 2 : AEDG Maximum Project Size requirements
CI-v4 EAc2:Optimize energy performanceposted by Kristen Callori on
Our project is an existing 300,000 sf Office building. Our client is both the new owner and will be the sole tenant.