Forum quick links
APPA Room Type Definitions
EBOM-2009 IEQc3.2:Green Cleaning—Custodial Effectiveness Assessmentposted by Alexis Doyle on
Hello,
ROI for LEED at Healthcare Campus
posted by Barbara Hamilton on
Please share any reports or data that exemplifies the ROI of building and operating a LEED building, specifically for healthcare, i.e. Acute Care Hospital and Out Patient Pavillion.
SSpc41 Walkable Project Site
NC-v4 INc1:Innovationposted by Helene Lefkowitz on
Our project team pursued this pilot credit and found it to be very achievable for projects in urban settings.
Exemplary Threshold
NC-v4 LTc5:Access to quality transitposted by Jane Bills on
I have a Core & Shell project with the following:
RAIL:
249 Weekday 117 Weekend
BUS:
LEED v4 CI EAb Opt. Energy Perf. : Option 2 : AEDG Maximum Project Size requirements
CI-v4 EAc2:Optimize energy performanceposted by Kristen Callori on
Our project is an existing 300,000 sf Office building. Our client is both the new owner and will be the sole tenant.
"Meeting but not Exceeding Local Zoning requirements" and Building Type based on local zoning
CS-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Edgar Arevalo on
1) I have been carefully looking over the description for achieving this credit under Case, Option 1, and what I find confusing is how it says in the handbook, "Size parking capacity must meet but
minor improvements within the water body body buffers: grade changes necessary to ensure public access
NC-v4 LTc2:Sensitive land protectionposted by Louise Schlatter on
Hi. I have a question about minor improvements within the water body body buffer. It says "grade changes necessary to ensure public access." We have a small First Order strea
Option 1 - Flushout of Non-Occupied Spaces
NC-v4 EQc4:Indoor air quality assessmentposted by Mike Bahr on
My project is a mid-rise building with the lower 5 levels being open air parking. Is that required to be flushed, and meet humidity and temperature requirements?
LEED V4.1 EBO+M Minimum Program Requirements
posted by Ben McEwen on
I cannot verify that LEED V4.1 EBO+M requires fulfillment of the usual MPRs that have been required for previous versions (permanent location, site boundaries, etc.). V4 do