Filtering Water in Cooling Tower Basin opposed to Filtering Makeup Water
NC-v4 WEc3:Cooling tower water useposted by Alyssa Faircloth on
Our project is an apartment building with retail and utilizes its own chiller plant with cooling towers.
Vague extraction location distance
NC-2009 MRc5:Regional Materialsposted by Edgar Arevalo on
I have been receiving LEED material forms along with submittal documents for each materials where they provide an exact distance between the manufacturing site and the project site, but when it com
polymer foam recycle content
CI-v4 MRc5:Building product disclosure and optimization - material ingredientsposted by severine secret on
What is the pre and post-consumer recycled content of furniture foam? (polymer). Is there an industry standard like MDF or steel?
parking spaces shared with adjacent multi-use complex
Hospitality-NC-v4.1 LTc7:Reduced Parking Footprintposted by Gail Napell on
We have a LEED NC_Hospitality project that has 15 off-site parking spaces SHARED with an adjacent multi-use complex. Do all requirements apply to these shared spaces? thank you!
European testing methods for US projects
NC-v4 EQc2:Low emitting materialsposted by Kavita K on
Can US projects use products which show compliance with VOC emissions requirement through AgBB (European) testing? Or does it need to be CDPH only.
FPL OnCall in South Florida
NC-v4 EAc4:Demand responseposted by Joseph Snider on
In South Florida, our local utility, Florida Power & Light (FPL), has a program call Business On Call. They set it up so they can turn off your A/C for short periods of time..."up to 17.5
Approved Bicycle Storage
NC-v4 LTc6:Bicycle facilitiesposted by Summer Minchew on
I read and understand the USGBC guidance regarding the selection of bike racks, that “Bicycle racks should reflect best practices in design and installation.
PIf2 Site Characteristics for individual building project on a LEED Campus
Schools-2009 PIf2:Project Summary Detailsposted by Yasha Ogg on
I have a project that is getting built in two phases on a LEED Campus. The first phase includes the construction of a new 3-8 grade building.
How long after a project is completed can credits be submitted?
Healthcare-v4 INc1:Innovationposted by Stephanie Kreps on
If a new construction project is already registered in LEED online, can the credit submittal process begin after the building has been completed?
Are Shades 'Furniture and Furnishings'?
CI-v4 EQc2:Low emitting materialsposted by Julie Hendricks on
Motorized and manual shades (such as Mechoshade) are in Division 12. Do they count as "stand-alone furniture items" that must be included in low-emitting materials calculations?