Base HVAC System for a Data Center / Server Room ASHRAE 90.1 - 2007
NC-2009 EAp2:Minimum Energy Performanceposted by Fatou Jabbie, | Technology | Design and Engineering Plan Reviews | Energy Code Compliance | Sustainability | LEED AP BD+C on
- Modeling a Data Center: 1,682.34 sq. ft.
- Call Center: 8,389 sq.
IPM Tracking Tool
EBOM-v4 EQc9:Integrated pest managementposted by Catalyst Partners on
The form requires teams to upload a "IPM Tracking Tool" which is not available on USGBC LEED Credit resources page or here on LEEDuser. Anyone know what it looks like or have it?
Concrete bonding agent below slab on grade
NC-v4 EQc2:Low emitting materialsposted by Vandita Mudgal on
We have to use a strong concrete bonding agent below a 2 to 3" Slab on grade to stick with the concrete foundation below the structure.
Pilot Credit Requirment
Pilot-Credits MRpc103:Integrative Analysis of Building Materialsposted by Maria Fiorelli on
I recently pursued this credit for a LEED v4 ID+C office space. It appears as though the credit documentation was approved; although, none of the three products have full documentation.
Indoor Water Use Reduction and Water Sense
NC-v4 WEc2:Indoor water use reductionposted by Jason Garvens on
On pg. 297 of the LEED v4 BD&C Reference Guide it states the general credit requirements but makes no mention of WaterSense labels being required there. However on pg.
Sound Transmission - Open Office Adjacency
CI-v4.1 EQc9:Acoustic Performanceposted by Tyler Cottrell on
How are Open Plan Office areas classified in terms of the Sound Transmission section?
Plywood Blocking
CI-v4.1 EQc2:Low Emitting Materialsposted by Allen Cornett on
Is plywood blocking in the wall part of the Wall Panel category or the Composite Wood category? It is not specifically address or excluded in the Wall Panel category, and I could ma
Visitor & handicap Parking Spots when calculating provided parking.
NC-v4 LTc7:Reduced parking footprintposted by Jason Garvens on
Can a project exclude dedicated visitor and handicap parking spots for purposes of calculating total provided capacity?
NC-2009 MRc5p regional Materials
NC-2009 MRc5:Regional Materialsposted by Sayali G on
Hello All,
This is my first time handling the LEED documentation, and I am stuck with one part in the calculator for Regional Credit.
PV installation built and commissioned prior to Occupancy
CI-v4 EAc4:Renewable energy productionposted by Gary Shlifer on
Our project is a 6 story office building, 250,000 sq feet. It is underconstruction.