Forum quick links
Clarification Re. General Emissions Requirement for Multi-part Acoustical Wall Treatment
NC-v4 EQc2:Low-emitting materialsposted by Vanessa Nelson on
We have a project with sound recording studios with drywall throughout and an acoustical wall treatment that will be assembled on site and attached to select portions of the drywall.
Industry-Wide EPD - error in description?
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Megan White on
Hi all, In the ref guide (p.514), it states that as part of Industry Wide EPD "the manufacturer is explicitly recognized as a participant by the program operator." However, this is the same exact
v2009 - SSc1: Site Selection - Wetland Protection
NC-2009 SSc1:Site selectionposted by Kathy Hrabovsky on
Is a Category 1 Forest Conservation Easement permitted to protect the limits of disturbance between a project site and an existing wetland if the project site is 60', instead of 100', from a wetlan
Uplight - lumens emitted above horizontal
NC-v4 SSc6:Light pollution reductionposted by Amanda Cunningham on
Can anyone clarify if the maximum allowed percentage of total lumens emitted above horizontal (by lighting zone) is applied to each individual luminaire or the sum of all lumens from all luminaires
Where to look for manufacturer documentation
NC-v4 EQc2:Low-emitting materialsposted by Lissa Spitz on
Is it just me? I'm having a hard time finding manufacturer documentation that confirms compliance with CDPH, aqBB, etc.
LEED v4.1 Renewable Energy Production
NC-v4.1 EAc5:Renewable Energyposted by Ruju Rathod on
We are evaluating the possibility of applying for the Renewable Energy Production credit under LEEDv4.1 for an office building that is receiving renewable energy from the grid.
Exemplary Performance Threshold a Core & Shell Project
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Ben Austin on
Is the threshold for exemplary performance for a CS project 20 EPDs?
Long Term Bike Storage - Distance to Building Entry
NC-v4 LTc6:Bicycle facilitiesposted by Catherine Blakemore on
I this question on the v4.1 forum, but have received an answer and am hoping for better results on the v4.0 forum.
75% compliance within office no longer allows us to count all SF?
NC-v4 EQc8:Quality viewsposted by emily reese moody on
In v3, if 75% of an office complied, we were allowed to include the whole SF of that space in our calcs.