Forum quick links
Baseline for Manufacturing facility energy usage...
NC-v4 EAc2:Optimize energy performanceposted by Rick Alfandre on
We are dealing with a manufacturing facility that has energy intensive process loads. Is there a standard way to establish a base case for manufacturing process loads?
pursuing Renewable Energy and Green Power with the v4.1 credit substitution path
NC-v4 EAc5:Renewable energy productionposted by Cindy Quinn on
I am working on a v4 project that is about to submit for final construction review. We must reach Gold and are right on the threshold, going in with 62 points, if all are earned. We don
Exterior walk-off mats permitted?
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Vince Briones on
Hi- has anyone gotten verification on whether exterior walk off mats are permitted under v4? The reference guide and current addenda are silent on that detail.
Mandatory Provisions of ASHRAE 90.1 2010,limit of application
NC-v4 EAp2:Minimum energy performanceposted by Cédric Marzolf on
Hi all,
Our building code is less restrictive than the ASHRAE 90.1 2010 for all the lighting controls and efficiency strategies.
Green Infrastructure Stormwater Reuse
NC-v4 SSc4:Rainwater managementposted by Patrick Murphy on
The definitions of green infrastructure and low impact development strategies appear to exclude capturing roof rainwater for reuse within the building for toilet flushing, irrigation, cooling tower
Good Pilot Credit - Adopt Strategies Early
Pilot-Credits EQpc123:Designing with Nature, Biophilic Design for the Indoor Environmentposted by Leina Naversen on
I recommend pursuing this pilot credit as an innovation point on any project. It's great to be able to incorporate biophilic design strategies into projects. Teams considering pursuing
MR Actual Cost Calculation vs. recycled and regional material cost that can be put in the numerator
NC-2009 MRc5:Regional Materialsposted by Jeff Wiedmeyer on
Can anyone say with certainty that projects seek LEED v2009 MR credits must include the costs for Div.
Fire Station Baseline System
NC-v4 EAc2:Optimize energy performanceposted by Jennifer Luce on
I understand fire station has residential spaces. Under 90.1, it requires residential to use PTAC #1 for system type. Due to having gas available, is it correct to model the baseline sy
EVSE - ISO 15118 compliance
NC-v4.1 LTc8:Electric Vehiclesposted by Mike Cavanaugh on
I'm looking into substituting this credit and pursuing option 1 (2% of spaces) but have a question about the third criteria for EVSE - Vehicle to Grid (ISO 15118) compliance. I've r
Alternative Water Source - Treated Off-Site Harvested Water
NC-v4 WEc2:Indoor water use reductionposted by Vincent Pieri on
Greetings!