Forum quick links
How to know when is the right time to submit for design review?
posted by Lauren Leatherbarrow on
The project is about to start (after the COVID-19) lockdown and so money is tight - so how long can we wait to submit for design review? This is my first LEED project how do I know when
Required percentage of vegetated area.
CS-v4 SSc3:Open spaceposted by Susan Di Giulio on
I have attended numerous seminars, including an all-day workshop at GreenBuild, on V4 and V4.1, and every time I was told that for this credit, the minimum required vegetated area is 25% of the 30%
Do not have LEED AP yet, but colleague does
NC-2009 IDc2:LEED Accredited Professionalposted by Edgar Arevalo on
I have been trying to find time to take the LEED AP exam but other projects that I'm a part of have been taking up my time that it makes it difficult to study now. However, my colleague who i
Meters for every floor? One Tenant Building
CI-v4.1 EAc3:Advanced Energy Meteringposted by Susan Di Giulio on
In our CI Project, we have a single Tenant. Per this credit, is a meter required for every floor of this 8 floor building? We believe that is not required for this CI project.
Short and Long Term Together?
NC-v4 LTc6:Bicycle facilitiesposted by Summer Minchew on
Can short and long term spaces be located together as long as all other requirements are met?
Bipolar Ionization devices; documenting reduced outside air quantities
Schools-NC-v4 EQp1:Minimum indoor air quality performanceposted by Kent B on
I have a new school project which currently has ionization devices throughout the HVAC RTUs. These ionization devices reduce the required outside air.
IES thermal block and baseline model with system 6
NC-v4 EAc2:Optimize energy performanceposted by Ying Lindsey on
Dear all,
I need your professional opinion about a project that I am currently working on.
Partial Compliance Requirement for Insulation Category
NC-v4.1 EQc2:Low-Emitting Materialsposted by Marcia Weekes on
For the insulation category, the credit language indicates that "At least 75% of all insulation, meets the VOC emissions evaluation." However, there is no further information to indic
Process HVAC modeling approach
NC-v4 EAc2:Optimize energy performanceposted by Pooja Sannamani on
Hi, we are consisering options for our high process load building in meeting the minimum requirements of the energy credit.
WaterSense & Future Baseline
EBOM-v4 WEp1:Indoor water use reductionposted by Waleed AlGhamdi on
I have a project in a peculiar situation that is not addressed outright by the guidelines language and I can use some help in interpreting the rules.