Process HVAC modeling approach
NC-v4 EAc2:Optimize energy performanceposted by Pooja Sannamani on
Hi, we are consisering options for our high process load building in meeting the minimum requirements of the energy credit.
WaterSense & Future Baseline
EBOM-v4 WEp1:Indoor water use reductionposted by Waleed AlGhamdi on
I have a project in a peculiar situation that is not addressed outright by the guidelines language and I can use some help in interpreting the rules.
Ventilation for the building as a whole or by space?
CS-v4 EQc1:Enhanced indoor air quality strategiesposted by Sara Greenwood on
Can you meet the enhanced ventilation performance criteria by providing >30% ventilation for the building as a whole, even if you do not meet this performance for all zones/spaces?
SSc5 Offsite Restoration Contract/Performance Period
EBOM-2009 SSc5:Site Development—Protect or Restore Open Habitatposted by Randi Davis on
The performance period for our project is only 90 days.
ASHRAE 2007 G 3.1.1 Exception B
NC-2009 EAp2:Minimum Energy Performanceposted by on
I am working on a retail project with three restaurant spaces. I got a comment below from the LEED reviewer.
Floor tile system components
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Monica Verastegui on
Our project has a porcelain tile floor with an anti-fracture and waterproofing membrane under it. Does the membrane product need to meet requirements for IEQc4.3?
Shared Parking Spaces and Existing EV Charging Stations on University Campus
NC-v4 LTc8:Green vehiclesposted by Ashley Hu on
Hi everyone,
Does anyone have a good Purchasing Policy Example
EBOM-v4.1 MRp1:Purchasing Policyposted by Frank Weiss on
We are familiar with the requirements of Version 3 but not Version 4 or 4.1 If someone had a good example or template of a prurchasing policy that would be very helpful.
Does "Healthcare" refer to HC-v4.1?
NC-v4.1 SSc4:Rainwater Managementposted by Deb Favaretto on
In both LEED BD+C: New Construction v4.1 and LEED BD+C: Healthcare v4.1, under Requirements in the credit language, USGBC uses the title text: "Percentile of Rainfall Events (1-3 points except Heal