Forum quick links
Overhead Vegetated Canopy
NC-v4 SSc3:Open spaceposted by Nita Christopher on
We have a campus site site with areas, outside of construction limits, that contain many mature shade trees with turf grass underneath.
LT 6 Bicycle Longterm and Shortterm v4 or v4.1 indoors?
NC-v4.1 LTc6:Bicycle Facilitiesposted by sandra DOLD on
PLease confirm if we upgrade to LEED v4.1 there is no requirement for indoor bike storage facilities for either long or short term biking. My understanding the shorterm needs to be within 100
Min outside air requirements for unoccupied spaces/buildings - energy modeling
NC-v4 EAc2:Optimize energy performanceposted by Pooja Sannamani on
Hi all,
We have an unoccupied building (sub station) that has corridors, toilet etc for very occasional maintenance occupancy.
Public Transportation subsidy?
NC-v4 LTc5:Access to quality transitposted by Erin Holdenried on
Reduced Parking and Green Vehicles offer credit for 20% discount in place of preferred parking. Has anybody tried a similar ACP approach for this credit? To get some credit, such a
Aircraft collision avoidance lighting in highrise buildings
EBOM-v4 SSc4:Light pollution reductionposted by Heather Appell on
Our project is a highrise office building in a downtown area.
Facade Role in LEED certification
posted by Leonardo Flores on
Hi LEEDusers.. I am new here and would like to hear any of your feedback on below. I understand that the facade or building envelope/enclosure of a building plays a role on EA and MR.
Management Plan Addressing How Pollution and Eutrophication of Waterways Would Be Minimized through Operational Changes
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Sandra Lester on
We have been asked by the CaGBC to provide a management plan addressing how pollution and eutrophication of waterways would be minimized through operational changes.
How to know when is the right time to submit for design review?
posted by Lauren Leatherbarrow on
The project is about to start (after the COVID-19) lockdown and so money is tight - so how long can we wait to submit for design review? This is my first LEED project how do I know when
Required percentage of vegetated area.
CS-v4 SSc3:Open spaceposted by Susan Di Giulio on
I have attended numerous seminars, including an all-day workshop at GreenBuild, on V4 and V4.1, and every time I was told that for this credit, the minimum required vegetated area is 25% of the 30%
Do not have LEED AP yet, but colleague does
NC-2009 IDc2:LEED Accredited Professionalposted by Edgar Arevalo on
I have been trying to find time to take the LEED AP exam but other projects that I'm a part of have been taking up my time that it makes it difficult to study now. However, my colleague who i