Forum quick links
MRC7 Materials & Resource Calculator entries
Retail-CI-v2009 MRc7:Certified woodposted by Brandy McShan on
When filling out the calculator for the MRc7 credit for V2009, one of my products said it is an FSC-Mix 70%. The other said it's FSC-Mix 96.5%.
Furniture and Furnishings
CI-v4 MRc3:Building product disclosure and optimization - environmental product declarationsposted by Jane Christen on
Pertaining to Option 2 - Multi-attribute Optimization: "Meet the requirements of the credit above and include furniture and furnishings within the project’s scope of work." I've reviewed the LEEDv
JUST Label experience
Pilot-Credits IPpc90:Social equity within the operations and maintenance staffposted by Patty Karapinar on
Hi, our firm has found that obtaining the JUST Label has helped us benchmark how we are doing as an organization and quantifying where we most need to improve. Working toward doing better and
Ascent Macerating Toilet
CI-v4 WEp1:Indoor water use reductionposted by Niccolo Benghi on
We are planning on using an ascent macerating toilet. I was wondering how to properly specify it in the Water Use calculator. Would this fixture be allowable?
Definitions for areas excluded in calculations?
NC-v4 WEp1:Outdoor water use reductionposted by Elizabeth Powers on
Both WEp1 and WEc1 state: "The following landscape types may be included or excluded from landscape calculations: vegetated playgrounds, athletic fields, food gardens, and urban agricultural areas.
Certified Multi-Attribute Products & Materials Pilot Credit
Pilot-Credits MRpc112:Certified Multi-attribute Products and Materialsposted by Patty Lloyd on
I have attempted this credit on a second project as well as receiving review comments on the first project.
Energy Modeling for Addition to Existing LEED NC-2009
NC-v4 EAp2:Minimum energy performanceposted by Joe Cavanaugh on
Our proposed project is to add about 30,000 square feet to an existing 55,000 square foot University science building. The existing building is LEED Gold under NC-2009. We hope to
Pilot-Credits EApc95 - Alternative Energy Performance Metric - NYC
Pilot-Credits EApc95:Alternative Energy Performance Metricposted by JLL Sustainability Consulting on
Our Project team was able to use this pilot credit to achieve additional points for a mixed use office space and trading floor in New York City.
C&S or NC: New Building with leased Office Space but occupied 80-90% by one tenant at completion
posted by Jessica Kavanagh on
Core & Shell vs New Construction:
Definition of Short term and Long Term bike storage
NC-v4 LTc6:Bicycle facilitiesposted by Martin Stowell on
How does LEED define short term and long term bike storage? What are some examples of each? This is for a NCV4 Core and Shell project. Thanks.