NC-v4.1 MRc2:Environmental Product Declarationsposted by Margaret Montgomery on
I think, perhaps foolishly, that we may have some products that can meet this requirement, but can only move forward if I can answer two key questions:
The project is the central energy plant
NC-v4.1 WEc3:Optimize Process Water Useposted by Stephanie Graham on
Our project is a LEED v4/v4.1BD+C new central cooling plant which uses geothermal for cooling on a university campus. Besides the plant, the building has office areas for the operators o
Solar Panels
CI-v4 EAc1:Enhanced commissioningposted by Alexis Voeltner on
Do solar panels that are being installed by the building owner need to be commissioned before the LEED submittal or can the commissioning be done later?
Multi Attribute Optimization
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Vibha Pai on
Is there any USGBC approved program which would help projects achieve credit points pursuing the option 2 multi attribute optimization of MR BPDO-EPD? Thanks in advance!
Mass Floor vs. Slab below grade for CSv4 - Prescriptive Approach
CS-v4 EAc2:Optimize energy performanceposted by Kena David on
We are pursuing CSv4 for a project and using the prescriptive approach for Optimize Energy Performance.
Public Project Currently Purchasing REC's for all Electricity for all Building looking to add Natural Gas Carbon Off-sets
NC-v4 EAc7:Green power and carbon offsetsposted by Summer Gorder on
I am working on a few projects for a public agency that purchases REC's for all of their buildings electricity, and they would like to add natural gas.
Vegetated external shades
CS-v4 EAp2:Minimum energy performanceposted by Maria Grimm on
I am working on a project that is designing external vegetated shades/screens. For local code compliance, we are not allowed to include the vegetated shades in our energy model.
NC / CS Mix
NC-v4 EAp2:Minimum energy performanceposted by Maria Grimm on
Question regarding a project that is registered as NC. The project is a approximately 70% residential (NC) and 30% core & shell office.
Supply and Return Fan Tracking OA compliance
NC-v4 EQp1:Minimum indoor air quality performanceposted by Mike oliva on
I feel like I've seen this discussed before on here but I'm not finding it at the moment. We're wondering if a VAV system serving multiple spaces can use AFMS at fan inlet bell for supply and
Simple buildings with only restroom fixtures and irrigation
NC-v4 WEc4:Water meteringposted by Susan Di Giulio on
I have this question for several university projects: the only water interior use in the buildings is restrooms.