Forum quick links
County Courthouse Project
NC-v4 SSc6:Light pollution reductionposted by Summer Gorder on
We are working on a County Courthouse project. The LEED Bounary is at the building edge, but the County has control of the right of way that extends to the edge of the sidewalk.
PEFC certification for wood materials from Austria?
NC-v4.1 MRc3:Sourcing of Raw Materialsposted by Laura strauss on
Does anyone know if PEFC crtification ia a "USGBC-approved equivalent" to FSC certification?
My contractor is looking at this CLT manufacturer in Austria:
Has anyone earned this pilot credit on a core and shell building?
Pilot-Credits WEpc94:No Cooling Towerposted by Jason Packer on
We're working on a 15-storey core and shell mixed use office building in the Pacific North West.
Controlled Burn?
NC-v4 SSc2:Site development - protect or restore habitatposted by Norma Lehman on
Has anyone ever used a controlled burn to eliminate invasive species?
Define available buildable space
NC-v4.1 LTc4:Surrounding Density and Diverse Usesposted by Cindy Cordo on
In BD+C-v4.1 LTc4, Option 1, Table 1a, in calculating the FAR for nonresidential uses, does on-site parking need to be included in the overall available acreage of the available building space
ASHRAE 90.1-2010 Mandatory Requirements in Existing Buildings
NC-v4 EAp2:Minimum energy performanceposted by Ashley Wisse on
EAp2 requires adherence to ASHRAE 90.1-2010 Mandatory Requirements at Section 5.4 and elsewhere.
UL Certified EPDs.
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Susan Di Giulio on
Hi,
Dimmed Fixtures & Demande Response
NC-v4 EAc4:Demand responseposted by on
We are designing an Assisted Lighting project, where many of the common areas will be dimmed by about 40%. What happens when we receive a DR signal? Since we're already dimmed, wil