Experience Feedback for Biophilic Design

Pilot-Credits EQpc123:Designing with Nature, Biophilic Design for the Indoor Environment
posted by  Robyn Vettraino  on 

In our experience with this pilot, it was really the intent that stood out as the driving force behind the design decisions and there was less of a need to simply check boxes of pre-set requirement

0

Forms

LEED v4.1 Discussion Forum
posted by  Aaron Kennedy  on 

I am looking for some confirmation here or direction on where to look on the actual submission process.

3
Default Avatar
M.Sc.
LCEE Life Cycle Engineering Experts GmbH
LEEDuser Basic Member
20 thumbs up
Tue Jan 5, 2021, 3:28 pm

Garden Sizing?

Pilot-Credits SSpc82:Local food production
posted by  Ty Champion  on 

Good morning all,

 

For a schools project, does LEED stop ccounting garden area after the maximum 1500 SF?

 

Thanks,

Ty

1
Fri Mar 5, 2021, 8:11 pm

Reuse of emergency water for toilet flushing?

NC-v4 WEc2:Indoor water use reduction
posted by  Erin Holdenried  on 

We have a laboratory project with emercency eye wash and shower stations that has a dedicated water supply.  The water in the pipes serving these fixtures must be flushed on a regular basis.&n

1
Wed Dec 30, 2020, 8:01 pm

DOL registered apprenticeship programs

Pilot-Credits IPpc90:Social equity within the operations and maintenance staff
posted by  Kavita   on 

Is there any website wherein one can check the Department of Labor registered apprenticeship programs? 

1
Tue Mar 2, 2021, 7:33 pm

Can lab surfaces be excluded?

CI-v4 EQc6:Interior lighting
posted by  Kristen Magnuson  on 

I'm working on a lab TI. The project's work surfaces include both lab tables and typical office-style workstations.

2
Default Avatar
SL+A INTERNATIONAL ASIA INC.
LEEDuser Premium Member
305 thumbs up
Wed Dec 23, 2020, 9:15 pm

EV charging station at shared parking structure

CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Yiyi ZHOU  on 

Our project is using a shared parking structure with 500m range from the LEED project. all the EV parking stations are located in that shared parking structure.

0
2
Mon Dec 21, 2020, 9:01 pm

Regional Material - No Other Leadership Extraction Practice Applicable

NC-v4.1 MRc3:Sourcing of Raw Materials
posted by  Brianne Grace  on 

I have a project where we have Pre-Cast Concrete Panels valued at close to $5Million.  The components of the panels (Cement, Sand, Aggregate, Fly-Ash) are all sourced within 100 miles of the p

1
Mon Dec 21, 2020, 9:57 pm

Passive House Certification

NC-v4 EAp2:Minimum energy performance
posted by  Matthew Kaplan  on 

We have a school project that is considering both PHIUS certification and LEED certification.