Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Exemplary Performance

NC-2009 SSc7.2:Heat Island Effect—Roof
posted by  N Reifenstein  on 

Does anyone know how to achieve the Exemplary Performance point for this credit?

2
Default Avatar
Sustainability Coordinator
WRNS Studio
LEEDuser Basic Member
2 thumbs up
Thu Dec 10, 2020, 7:10 pm

Indoor Air Quality Assesment

NC-v4.1 EQc4:Indoor Air Quality Assessment
posted by  Gregory Bergmiller  on 

Indoor Air Quality Assesment: Were are using path 2 During occupancy and we had 1 day were the outdoor humidity exceeded 60% RH.

1
Thu Aug 19, 2021, 1:46 pm

How does reduced occupancy effect the Arc LEED score during the times of COVID?

Working through COVID-19
posted by  Austin Van Heusen  on 

A resort we are working with has seen a reduction in occupancy from 95% to less than 5% during the last 9 months.  They would like to resubmit for recertification and we are wondering how the

0

Bollard lighting on a recreational path

NC-v4.1 EAc2:Optimize Energy Performance
posted by  Randi Meredith  on 

My town is proposing to install lighting along a partially wooded Rails-to-Trails path. Looking for specific recommendations for adequate lighting using bollards or something similar.

0

ADC Compliance

NC-v4 MRp2:Construction and demolition waste management planning
posted by  Jean Smith  on 

If all C&D debris was taken to a transfer station that does not use ADC because it is not a landfill, are we in compliance if they divert the necessary percentage of waste?

1
Sun Dec 6, 2020, 1:49 pm

Values for Option 01 Calculation

NC-2009 WEc1:Water Efficient Landscaping
posted by  N Reifenstein  on 

We are trying to perform the calculation per the online credit form and are not able to access the ks, kd, and kmc values, which are supposed to be in the LEED v 2009 Reference Guide.

0

Regular building occupants in a Healthcare Projet?

Healthcare-v4 LTc6:Bicycle facilities
posted by  Priscillia Champagne  on 

We are building a healthcare project. We want to calculate the number of showers required in the project, so we have to consiter the regular building occupants.

1
Thu May 20, 2021, 7:16 pm

Owner's Project Requirements (OPR) for LEED V4.1

NC-v4.1 IPc1:Integrative Process
posted by  Rodel Urmatan  on 

Anyone has an OPR template for LEED V4.1?  I saw one here that is for V4.  Thanks!

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Dec 2, 2020, 4:28 pm

FGI Guidelines

Healthcare-v4.1 SSc7:Places of Respite
posted by  Aaron Kennedy  on 

Does anyone have a copy of the 2010 FGI Guidelines regarding to wayfinding?

Thank you,

AAron

0