Forum quick links
Living Building Challenge - Materials & LEED MR Credits
posted by Dane Andersen on
Does anyone know if there is "reciprocity", so to speak, between Living Building Challenge - Materials Petal and LEED MR and EQ credit documentation?
LEED ID+C: Commercial Interiorsv4 - LEED v4 Option 1 EPD
CI-v4 MRc3:Building product disclosure and optimization - environmental product declarationsposted by Andrew Rittenhouse on
Would electronics products such as roller shade motors that are RoHs compliant meet the requirement for EPD's under this Credit.
Perhaps under:
Energy Provider Clean Energy programs and the Energy Calculation
CS-v4 EAp2:Minimum energy performanceposted by Lou Niles II on
Hello anyone have any feedback on pathways to usinbg an energy providers Clean Energy Program for more credit in Minimum Energy Performance or Green Power/ Carbon Offsets??
All landscaped areas removed
NC-v4 WEp1:Outdoor water use reductionposted by Lou Niles II on
It does not appear LEED give credit for removig all landscaped areas from the exiwting conditions? or at least I cannot find a path for that.
Type III external vs external
NC-v4.1 MRc2:Environmental Product Declarationsposted by Michelle Halle Stern on
When I look up EPDs in UL Spot it is not always obvious what type of EPD I'm looking at. If it's for a specfic product can I assume externally verified? How would I know the difference?
Healthcare renovation
posted by Denise Thompson on
Hi, we're renovating 2 of the floors of an inpatient facility. Would this use the BD+C for Healthcare; BD+C for NC and Major Renovations; or the CI rating system?
Thank you.
Option 3. Carshare - Occupant Classification
NC-v4.1 LTc7:Reduced Parking Footprintposted by Maddie Spinski on
"Provide at least one vehicle parking space for every 100 occupants, rounded up. If the project has fewer than 100 occupants, provide one carshare vehicle parking space."
Fixture Family Clarification
Data-Centers-NC-v4.1 WEp2:Indoor Water Use Reductionposted by Sonya Cortez on
My project has: 1-men's restroom (has a urinal), 1-women's restroom, and 8-unisex restrooms (two have urinals)
Looking for 1 more point!
posted by Jeannie Rueter on
We recently received technical advice on our preliminary construction review. They asked for documentation to support the regional credit.
Envelope Commissioning Deficiencies
NC-v4 EAc1:Enhanced commissioningposted by Jesse Klobuchar on
Hello Everyone,
I hope that everyone is well. I am new to the forum. I appreciate all of the contributions that people make here to make LEEDuser what it is.