Forum quick links
Floors in elevators
NC-2009 IEQc4.3:Low-emitting materials - flooring systemsposted by Cesar Ruiz on
Hello, Im working on a project that will install the floor finishing in the elevators. Is this area excluded for credit compliance or does the tile used has to fulfill the requirements?
Open mall shopping centre baseline model
CS-v4 EAp2:Minimum energy performanceposted by Ricardo Sá on
I'm currently working in a project of a shopping centre (common areas + tenant areas) pursuing LEED certification (Core&Shell).
n/a
CS-2009 IEQp1:Minimum indoor air quality performanceposted by Alan Viale on
Dear all, We are working on a mall with natural ventilation on the common areas (corridors).
Lighting Power Density requirement for Tenant spaces
CS-2009 EAp2:Minimum energy performanceposted by Pedro Urazan on
Hi, Is it required that the Tenants comply in their lighting designs with the Lighting Power Density requirement of ASHRAE 90.1 2007?
Eficiency of Electric motors operated with VFD
CS-2009 EAp2:Minimum energy performanceposted by Pedro Urazan on
I would like to know if electric motors that are going to be operated by a VFD (Variable Frequency Drive), need to comply with the eficiency requirements of the ASHRAE 90.1 table 10.8. Thanks
multi occupant spaces for outpatient
Healthcare-v2009 IEQc6.1:Controllability of systems - lightingposted by andres ramirez on
HI, Multi occupant patients spaces (eg. waiting rooms for outpatients) should be listed on the shared multioccupant spaces IEQc6.1-3 or on patient areas Table IEQ6.1-2.? thanks
Buildings w/ programmatic dependency/architectural cohesiveness
CS-v4 MPR2:Must use reasonable LEED boundariesposted by Ricardo Sá on
I have a client that is developing an open-air type shopping center (i.e., the tenant stores are arranged in blocks that open to exterior interconnecting walkways) and is willing to pursue LEED cer
One single building
NC-2009 PIf1:Minimum Program Requirementsposted by MKK LEED on
We are writing to you because we registered a project like one single building, however the project does not comply with the USGBC definition of ‘one single building’ or LEED interpretation 10203,
Aeronautical Maintenance Workshop
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Gustavo De las Heras Izquierdo on
This is a 70,000 sf Aeronautical Maintenance Workshop in Colombia with the following features: -The space is 6 meters height. -There are interior walls 5 meter height.
2 Buildings in the same lot
CS-2009 MPR3:Must use a reasonable site boundaryposted by Guillermo Alonzo on
Hello from Colombia, We have a C&S Project that has two different buildings (Hotel and offices building) in the same boundary.