This is a 70,000 sf Aeronautical Maintenance Workshop in Colombia with the following features:
-The space is 6 meters height.
-There are interior walls 5 meter height. Therefore, all the workshop is connected at the top of the space (1 meter)
-There are plenty of skylights that provide natural ventilation.
-Distances and size of openings meet sections 6.4.1 and 6.4.2 of the Standard ASHRAE 62.1 - 2010.
My question is: can I consider it correctly ventilated considering the openings are at the top of the space? We are going to use ASHRAE 62.1-2010 to demonstrate compliance for the whole workshop.
Thanks in advance.
Miriam Ramirez Baumgarten
M.Sc. LEED AP BD+C, ID+C, WELL AP, EDGE AuditorBaumarch
14 thumbs up
December 9, 2015 - 2:25 pm
Our question is if the interior 5m division walls would affect compliance with the prerequisite even though every "cubicle" or confined area is less than 25´(8m) away from the openings (vertically as well as horizontally) Any thoughts?
Thanks!
Miriam