Forum quick links
Regional credit in Argentina
CS-2009 RPc1:Regional Priorityposted by Ines Fischer on
Hello Everyone!
I wanted to know with what percentaje of water savings do I have access to the regional extra credit in Argentina?
Is it 1 credit?
LEED OM v4.1 Enhanced Refrigerant Mgmt prerequisite & VRF / multisplit systems
posted by Andres Schwarz on
I have noticed that in LEED OM v4.1 beta has changed the Enhanced Refrigerant Management credit to a prerequisite.
C&S Occupancy
CS-2009 IEQp1:Minimum IAQ Performanceposted by Paula Hernandez on
Hi,
We are working on a C&S project. We know that the spaces on the Ground Floor will be Restaurants and Sales spaces.
Occupancy in WEp1 inconsistent with PIf3 form
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Ines Fischer on
Hello everyone!
I have the problem that the occupancy of PIf3 is inconsistent with the occupancies used in the WEp1 calculator.
Which calculator should I use?
NC-2009 MRc4:Recycled Contentposted by Ines Fischer on
Hi everyone!! Thanks for all the support in my preovious question
New calculator- cutsheets provided ?
NC-2009 MRc4:Recycled Contentposted by Ines Fischer on
Hi all!
I am new at the LEED community and I need some help.
I have downloaded the last materials calculator and I see there´s no space for cutsheets anymore.
Process Loads
NC-2009 EAp2:Minimum Energy Performanceposted by Paula Hernandez on
Hello,
I am modeling a winery and some of the chillers participate only to chilled and heat wine tanks.
MInisplit Units
NC-v4 EQp1:Minimum indoor air quality performanceposted by Paula Hernandez on
Hi, I would like to know if minisplit (non-ducted) units have to comply with Standard 62.1-2010, Section 5.8, "...p0articulate filters or air cleaners with a minimum efficiency reporting valu
Retail (other than mall) or Enclosed Mall
Retail-CI-v2009 EAc5:On-site renewable energyposted by Geraldine Assmus on
I'm certifying a project which is located within a mall, it has access from the street and from inside the mall.
Tenant Space Energy Modeling
CI-v4 EAp2:Minimum energy performanceposted by Paula Hernandez on
To comply with EA_p2 we are goint to develo the energy simulation of the Tenant Space Scope of Work. My questions are: 1.