Forum quick links
Plug loads for server rooms
NC-2009 EAp2:Minimum Energy Performanceposted by MARCIO OROFINO on
Hi. I am working for this project - a small one-floor office building, which has a 14 m2 server room.
DIVERSE USE IN A ISLAND RESORT DEVELOPMENT
Hospitality-NC-v4 LTc4:Surrounding density and diverse usesposted by Amal Venugopal on
We are working on a large scale resort development project which is situated on an natural island . The project has more than 8 diverse uses within its boundary.
PRESENCE OF WATER
Pilot-Credits EQpc123:Designing with Nature, Biophilic Design for the Indoor Environmentposted by Ingrid Muñoz on
Hello, we are pursuing the Designing with Nature, Biophilic Design for the Indoor Environment pilot credit for an interior commercial.
Imported material with EPD
NC-v4.1 MRc2:Environmental Product Declarationsposted by Gustavo De las Heras Izquierdo on
Hello,
We have received the following review comment:
No-irrigation documentation
NC-v4 WEp1:Outdoor water use reductionposted by Alexia Anastassiadis on
Hi all,
What sort of documentation do you submitt to demonstrate no need for irrigation in international projects? (i.e. we don´t have a tool like the USDA hardiness zones)
Option 1 - what is the minimum number of cycles
NC-v4.1 WEc3:Optimize Process Water Useposted by Gustavo De las Heras Izquierdo on
Hello,
Let's say that my project has a bad quality of potable water, and the concentration levels are the same as Table 2. Therefore, the maximum number of cycles would be "1 cycle".
Hotel Resort - multiple blocks as a "single building"
Hospitality-NC-v4 MPR3:Must comply with project size requirementsposted by A&L SUSTENTABILIDADE on
Our project is a Hotel Resort, consisting of the main admin building, apartment blocks, individual villas, spa blocks, utility blocks, restaurants, multipurpose buildings, etc.
Opening an Anticipated credit
posted by Victoria Rios Esteve on
Hi! We are working on a LEED v2009 Core and Shell certification. We are about to upload Construction Submittal's documentation.
v4.1 O+M: working with a new building
posted by Victoria Rios Esteve on
Hi everyone,
Recycling rate of construction and demolition waste
CS-v4 MRc5:Construction and demolition waste managementposted by Tiago Rigobello on
How can we prove the recycling rate of construction and demolition waste made by the recycler? What are the options in Brazil?
Thanks! Best regards!