Process Loads
NC-2009 EAp2:Minimum Energy Performanceposted by Paula Hernandez on
Hello, I am modeling a Winery, where most of the chillers and boilers are used for process tasks. I am using HAP to model this building, and I have this questions regarding the best way to model th
Anti Smoking Sign
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Marcelo Maciel de Santa Helena on
We have a question about the location of the anti smoking signs. Leed requires that the signs are installed in certain areas, such as elevator, circulation, rooms?
Extraction Monoxide in Basement During Construction
CS-2009 IEQc3:Construction IAQ Management Plan—During Constructionposted by Alan Viale on
we have a project of 20 floors of offices; and has 10 parking basements by local regulations. The design of parking in basements requires extraction monoxide. Currently is under construction and h
Major renovation of historic landmark building
NC-2009 EAp2:Minimum Energy Performanceposted by Veronica Reed on
Hello I am working on the major renovation of a historic landmark building in part of an area protected as world heritage site by UNESCO, and the building cannot be modified in its envelope since
Laboratory
NC-v4 WEp2:Indoor water use reductionposted by Vanessa Montezuma Ramos on
My project is an Investigation Center which has laboratories. The lavatories found in the lab area (chemistry) should be considered in this credit?
Vertical fenestration for Proposed Case
NC-2009 EAp2:Minimum Energy Performanceposted by Billy Condor on
Hello, I'm evaluating the energy efficiency of a building that has almost 100% of curtainwall, however the architect says that his project has high beams height (the ones attached to the exterior
Ventilation Rates for a Dental Office
NC-2009 IEQp1:Minimum IAQ Performanceposted by Cesar Ruiz on
Hello LEEDuser community, We're working on an innovation and wellness center which, among different types of spaces, has a Dental Office in which small procedures will be performed. We're not sur
Scope of system performance testing
CI-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Billy Condor on
I have two questions regarding Cx activities for a LEED CI proyect: 1.
Proper Pedestrian Accesss to Basic Services
CS-2009 SSc2:Development Density and Community Connectivityposted by Jimena Etchegaray on
We are certifying a project in a semi rural area. Although we have identified 10 basic services, the reviewers have questioned the pedestrian access to these areas.
Green roof compliance on runoff
NC-v4 SSc4:Rainwater managementposted by Filipe Boni on
Hi! I'm working on a green roof over a building in IP and want to understand what system (extensive, etc)would be better. I was able to calculate the 95th percentile of my site (46mm) and the Sma