Can a LEED NC certified building pursue now a LEED EBOM?
EBOM-v4 MPR2:Must use reasonable LEED boundariesposted by Veronica Reed on
Hello, our project, an airport terminal, got LEED Gold certified this month under version 2.2. The owner now wants to explore certifying the building for operations and maintenance under V4.
Dist. Center - Light polution
Warehouses-NC-v4 SSc6:Light pollution reductionposted by Antonio Macedo Filho on
If the design of a distribution center worked 24 hours in 3 shifts, even at night, could we not get that credit? If we use external lighting with zone presence sensors would not it be possible?
Window-sill
NC-v4 EQc8:Quality viewsposted by Antonio Macedo Filho on
I would like to know if there is a maximum obstruction height of views for option 1.
a one-family House can be LEED EBOM?
EBOM-2009 PIf2:Project Summary Detailsposted by Alan Viale on
Hi, we have a house for one-family with the interest to be a LEED EBOM. is this possible? all the credits which require measurement, verification, or following can be responsible of the family o
n/a
CS-2009 IEQp1:Minimum indoor air quality performanceposted by Alan Viale on
Dear all, We are working on a mall with natural ventilation on the common areas (corridors).
Multiple Buildings or One Building Certificacion
CS-2009 MPR3:Must use a reasonable site boundaryposted by Paula Hernandez on
We have a C&S Project that has two identical buildings in the same parcel.
Floors in elevators
NC-2009 IEQc4.3:Low-emitting materials - flooring systemsposted by Cesar Ruiz on
Hello, Im working on a project that will install the floor finishing in the elevators. Is this area excluded for credit compliance or does the tile used has to fulfill the requirements?
Brazilian equivalent standard
CI-2009 EAp2:Minimum energy performanceposted by Aline Luther on
I would like to know if there is any Brazilian Standard that can substitute the ANSI / ASHRAE / IESNA Standard 90.1-2007.
Brazilian Equivalent Standard
CS-2009 EAp2:Minimum energy performanceposted by Pamela Svetllana Santos Souza on
Hello, I'm modelling for LEED C&S 2009. The project has 26 floor type of mixed-use offices.
Scope of the Pre-requisite in C&S Shopping mall
CS-2009 IEQp1:Minimum indoor air quality performanceposted by Alan Viale on
We are working on a new shopping mall. as usually in my country, a anchor store (tenant deparment store) was first developed and constructed and now is operating.