Existing Building Commissioning
EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysisposted by sebastian castañeda on
Hello. I am a student who is interested in learning about the methodology of LEED certification and there are some points that I do not clear.
Inconsistent Price Square Meters versus Square Feet
Pilot-Credits SSpc83:Offsite Financial Support for Habitat Protectionposted by Ben Stanley on
We're pursuing this pilot credit for an EBOM project and it looks like the stated price for financial support is inconsistent if your reporting site area in square meters ($0.5 /square meter) versu
Can a LEED NC certified building pursue now a LEED EBOM?
EBOM-v4 MPR2:Must use reasonable LEED boundariesposted by Veronica Reed on
Hello, our project, an airport terminal, got LEED Gold certified this month under version 2.2. The owner now wants to explore certifying the building for operations and maintenance under V4.
Dist. Center - Light polution
Warehouses-NC-v4 SSc6:Light pollution reductionposted by Antonio Macedo Filho on
If the design of a distribution center worked 24 hours in 3 shifts, even at night, could we not get that credit? If we use external lighting with zone presence sensors would not it be possible?
Window-sill
NC-v4 EQc8:Quality viewsposted by Antonio Macedo Filho on
I would like to know if there is a maximum obstruction height of views for option 1.
Aeronautical Maintenance Workshop
NC-2009 IEQp1:Minimum IAQ Performanceposted by Gustavo De las Heras Izquierdo on
This is a 70,000 sf Aeronautical Maintenance Workshop in Colombia with the following features: -The space is 6 meters height. -There are interior walls 5 meter height.
Multiple Buildings or One Building Certificacion
CS-2009 MPR3:Must use a reasonable site boundaryposted by Paula Hernandez on
We have a C&S Project that has two identical buildings in the same parcel.
Floors in elevators
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Cesar Ruiz on
Hello, Im working on a project that will install the floor finishing in the elevators. Is this area excluded for credit compliance or does the tile used has to fulfill the requirements?
Brazilian equivalent standard
CI-2009 EAp2:Minimum Energy Performanceposted by Aline Luther on
I would like to know if there is any Brazilian Standard that can substitute the ANSI / ASHRAE / IESNA Standard 90.1-2007.
Brazilian Equivalent Standard
CS-2009 EAp2:Minimum Energy Performanceposted by Pamela Svetllana Santos Souza on
Hello, I'm modelling for LEED C&S 2009. The project has 26 floor type of mixed-use offices.